JUST ADD WATER!

JUST ADD WATER!

Assessment

Interactive Video

History

KG - University

Hard

Created by

Quizizz Content

FREE Resource

The video tutorial explains the concept of instant bathrooms, starting with an introduction to instant solutions. It details the installation process using a crane to position a prefabricated bathroom unit. The Greater London Council's pilot scheme for installing these units in old cottages in Cashelton, Surrey, is discussed, highlighting the minimal disturbance to tenants. The final steps involve sealing and connecting the unit, with a cost target of around £1350.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in installing an instant bathroom according to the video?

Connect the plumbing

Add water

Seal the joint

Push in the wall around the dotted line

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who initiated the pilot scheme for instant bathrooms?

The UK Government

The Surrey County Council

The Greater London Council

The Cashelton Housing Authority

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of the instant bathroom project?

To reduce the cost of housing

To install bathrooms with minimal tenant disturbance

To modernize old cottages

To increase property value

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step before the instant bathroom is ready for use?

Install the crane

Push in the wall

Prepare the foundations

Add water

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the estimated cost of installing an instant bathroom?

£1000

£1350

£1500

£2000