AUCKLAND HARBOUR BRIDGE - SOUND

AUCKLAND HARBOUR BRIDGE - SOUND

Assessment

Interactive Video

History

KG - University

Hard

Created by

Wayground Content

FREE Resource

The Auckland Harbour Bridge, nine years old, is undergoing an expansion to double its capacity. Japanese cranes are used to add two new lanes on each side, effectively creating two additional bridges. The new spans are supported by existing piers but not connected to the current structure. The construction involves precise alignment of heavy slabs, resulting in three bridges for the cost of one.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of the Auckland Harbour Bridge expansion?

To create a new tourist attraction

To replace the old bridge

To add pedestrian walkways

To double the current roadway capacity

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which country is providing the construction firm for the bridge expansion?

China

United States

Japan

Australia

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How are the new lanes being added to the Auckland Harbour Bridge?

By widening the existing lanes

By building a new bridge

By constructing a tunnel underneath

By adding box section slabs on each side

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What supports the new spans of the bridge?

Newly built piers

Floating platforms

Suspension cables

The existing piers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the weight of each slab used in the bridge expansion?

500 tonnes

400 tonnes

300 tonnes

200 tonnes