SEVERN TUNNEL

SEVERN TUNNEL

Assessment

Interactive Video

History

KG - University

Hard

Created by

Wayground Content

FREE Resource

The video discusses the construction of a two and a quarter mile tunnel under the 7 and the Y, forming a 65-mile power link between England and Wales. The tunnel, ten feet in diameter, will carry high-power electric cables as part of the super grid connections. Construction involves sinking shafts and using giant tunnelling machines guided by laser systems. The project is expected to take two years, with one year for tunnelling and another for cable laying. The video concludes with a mention of future challenges.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the length of the tunnel being constructed under the 7 and the Y?

One mile

Ten miles

Five miles

Two and a quarter miles

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of the tunnel?

To provide a pedestrian walkway

To serve as a railway tunnel

To carry high power electric cables

To transport water

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the diameter of the tunnel?

Fifteen feet

Ten feet

Twenty feet

Five feet

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What technology is used to keep the tunneling machines in line?

GPS tracking

Laser beam guidance system

Manual alignment

Magnetic sensors

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long will it take to lay the cables after the tunnel is completed?

Six months

Two years

Three months

One year