BRIDGE BUILDING

BRIDGE BUILDING

Assessment

Interactive Video

History

KG - University

Hard

Created by

Wayground Content

FREE Resource

The video discusses the replacement of an old wartime pontoon bridge over the River Vistula at Keesmark in Fulham with a new prefabricated bridge. This new bridge, weighing over a thousand tons, is moved with precision by experts from various organizations, including the dockyards at Gudansk and the Polytechnic. The project is highlighted as one of the largest engineering feats involving a precast bridge, showcasing modern man's ingenuity.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What has replaced the old wartime pontoon bridge over the River Vistula?

A new prefabricated bridge

A new suspension bridge

A new arch bridge

A new cable-stayed bridge

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the weight of the new bridge?

Over three thousand tons

Over two thousand tons

Over five hundred tons

Over a thousand tons

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many tugs are involved in moving the new bridge?

One pulling and one pushing

Three pulling and one pushing

Two pulling and two pushing

Two pulling and one pushing

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which organizations are involved in the bridge construction?

The Polytechnic and the Hydrological Administration

The Dockyards at Gudansk and the Polish Army

The Polish ship salvage organizations and the Polish Navy

The Dockyards at Gudansk and the Polish Air Force

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What makes the construction of this bridge significant?

It is the longest bridge in Poland

It is the first bridge made entirely of steel

It is the tallest bridge in Europe

It is one of the largest engineering feats involving a precast bridge