Driving alongside Keystone XL oil pipeline

Driving alongside Keystone XL oil pipeline

Assessment

Interactive Video

Science, Physics, Chemistry

9th - 10th Grade

Hard

Created by

Quizizz Content

FREE Resource

The video tutorial covers the planning and requirements for a project, focusing on the use of butane and its recycling. It describes the facility layout, including the main pipe rack and the lines for gas and emulsion. The tutorial also touches on future experiments and developments, particularly in the context of thin paint applications.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the initial plan regarding the use of canopies in the energy system?

Start with multiple canopies for full solar

Begin with one canopy and not achieve full solar

Avoid using canopies altogether

Use canopies only during peak hours

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of the butane in the energy system?

To be used once and discarded

To be recycled after initial purchase

To be used as a backup energy source

To be mixed with other gases

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which line is NOT mentioned as part of the main pipe rack?

Water line

Casing gas line

Steam line

Emulsion line

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens when steam is injected into an oil reservoir?

It increases the oil pressure

It solidifies the oil

It releases natural gas

It reduces the temperature

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the current cutoff for thin paint experiments?

10 to 15 meters

5 to 10 meters

15 to 20 meters

20 to 25 meters