Ampliación del canal de Panamá: nerviosismo de remolcadores

Ampliación del canal de Panamá: nerviosismo de remolcadores

Assessment

Interactive Video

Business, Geography, Science

9th - 10th Grade

Hard

Created by

Quizizz Content

FREE Resource

The Panama Canal is set to open its new expanded locks, but tugboat operators are concerned about insufficient training for handling the large New Panamax vessels. These vessels, measuring up to 366 meters, pose risks if control is lost. Operators are demanding better training and higher wages due to increased risks. A trial is scheduled for the end of the week, with the official inauguration on June 26. The expansion, delayed by over a year and costing $5.25 billion, will double the canal's capacity, attract new markets, and reduce global shipping costs by $8 billion annually.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main concern of the tugboat operators regarding the new Panama Canal system?

The size of the New Panamax vessels

The lack of sufficient training

The increased number of vessels

The cost of the expansion

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum length of the New Panamax vessels?

200 meters

300 meters

366 meters

400 meters

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the tugboat operators demanding in addition to more training?

New equipment

More vacation days

Higher salaries

Better working hours

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is the inauguration of the new locks scheduled?

July 15

June 20

June 26

July 1

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much is the Panama Canal expansion expected to reduce global shipping costs annually?

$8 billion

$7 billion

$6 billion

$5 billion