Dam Construction and Operation Concepts

Dam Construction and Operation Concepts

Assessment

Interactive Video

Science, Geography, Architecture

9th - 10th Grade

Hard

Created by

Patricia Brown

FREE Resource

Dams are crucial for water storage, flood control, and electricity generation. The Three Gorges Dam in China is the largest hydropower dam, significantly impacting the environment. Dams are built between water sources and valleys, creating reservoirs. Construction involves diverting rivers, excavating soil, and using concrete molds. Foundations must be strong to support the dam and withstand water pressure. After construction, dams undergo testing to ensure safety. Dams are categorized by hazard levels, and safety features like spillways are essential. Operators must adapt to changing water levels and conditions.

Read more

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the primary purposes of building dams?

To create new wildlife habitats

To store large amounts of water

To increase the speed of river flow

To reduce the height of mountains

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which dam is known as the world's largest hydropower dam?

Hoover Dam

Itaipu Dam

Three Gorges Dam

Aswan High Dam

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is typically done to a river during the initial stages of dam construction?

The river is widened

The river is deepened

The river is diverted

The river is dammed immediately

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a crucial factor for the foundation of a dam?

It must be rigid and strong

It must be made of wood

It should be porous

It should be flexible

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How are soft soil or rock pockets handled during dam construction?

They are left as they are

They are filled with water

They are replaced with stronger materials

They are covered with plastic

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of building concrete batching plants on site during dam construction?

To house construction workers

To store construction equipment

To provide large quantities of ready-to-use concrete

To reduce noise pollution

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step after a dam is built before it becomes operational?

The dam is immediately used for electricity generation

The reservoir is filled to operational levels

The dam is tested with the first filling

The dam is painted

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?