

Funicular Railway Project Insights
Interactive Video
•
Physics
•
9th - 10th Grade
•
Practice Problem
•
Hard
Jackson Turner
FREE Resource
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the primary purpose of the first funicular in the village of Stuce?
To transport goods
To connect with neighboring countries
To bring in tourists and provide access to the resort
To serve as a military transport
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the planned altitude climb for the new funicular?
4,000 feet
3,000 feet
2,500 feet
1,000 feet
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What innovative drilling technique was used for tunnel excavation?
Horizontal drilling
Raised boring
Vertical shaft sinking
Directional drilling
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was a major challenge faced during the tunnel construction?
Shortage of skilled labor
Drill piece breaking
Extreme weather conditions
Lack of funding
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How do the revolutionary carriages adjust to steep gradients?
By using magnetic levitation
Through hydraulic engineering
With manual adjustments
By changing the track layout
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the maximum gradient the carriages were tested on?
120 percent
110 percent
90 percent
100 percent
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When did the new Stu Spawn funicular railway open to the public?
December 17, 2015
December 17, 2016
December 17, 2017
December 17, 2018
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?