Loading Process and Capacity of the Equinox

Loading Process and Capacity of the Equinox

Assessment

Interactive Video

Business

9th - 10th Grade

Hard

Created by

Lucas Foster

FREE Resource

The video tutorial covers the loading process at Thunder Bay, focusing on the Equinox ship. It highlights the role of Kirk Lake, the first mate, in ensuring efficient loading of 30,000 tons of grain. The tutorial explains the importance of a well-planned load distribution to prevent listing or capsizing. It also emphasizes monitoring the ship's draft to comply with the St Lawrence Seaway's depth restrictions. The goal is to maximize cargo without exceeding limits, as any shortfall could result in significant revenue loss.

Read more

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the loading capacity of the Equinox per hour at Thunder Bay?

2,000 tons

2,500 tons

1,000 tons

1,500 tons

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total load capacity the Equinox aims to achieve?

20,000 tons

30,000 tons

25,000 tons

35,000 tons

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is responsible for the loading process on the Equinox?

The captain

The dock supervisor

The chief engineer

Kirk Lake, the first mate

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the deck crane during the loading process?

To monitor the ship's draft

To assist in loading cargo

To unload cargo

To distribute the cargo evenly

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to distribute the wheat evenly across the ship's holds?

To reduce fuel consumption

To speed up the loading process

To make unloading easier

To prevent the ship from listing or capsizing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth the Equinox can sit in the water?

26 feet

26 and 3/4 feet

25 feet

27 feet

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What could happen if the ship's draft exceeds the allowed limit?

The ship could sink

The cargo could be damaged

The company could be fined

The ship could capsize

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the consequence of not maximizing the cargo load?

Increased loading time

Lost revenue for the company

Increased fuel consumption

Delayed departure

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of the loading process on the Equinox?

To reduce crew workload

To minimize loading time

To maximize cargo and ensure safety

To improve fuel efficiency