Building Strong Structures with Boxes

Building Strong Structures with Boxes

Assessment

Interactive Video

Science

3rd - 4th Grade

Practice Problem

Hard

Created by

Jennifer Brown

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the caveman's initial mistake when building the shelter?

He used too many boxes.

He built the shelter too wide.

He stacked the boxes in tall stacks.

He didn't use any boxes.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in building a strong wall?

Stacking boxes in tall stacks.

Laying out a foundation.

Building a roof first.

Using only large boxes.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How should boxes be stacked to ensure a strong wall?

In a circular pattern.

In an interlocking manner.

Directly on top of each other.

Without any gaps.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was missing from the caveman's final structure?

A door.

A box.

A window.

A roof.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What topic will be covered in the next lesson?

Making a door.

Building a bridge.

Building a roof.

Using different materials.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?