Fehmarn Belt Tunnel Quiz
Interactive Video
•
Engineering
•
9th - 12th Grade
•
Practice Problem
•
Hard
Jennifer Brown
FREE Resource
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary purpose of the Fehmarn Belt Tunnel?
To create a new tourist attraction
To connect Denmark and Sweden
To reduce travel time between Copenhagen and Hamburg
To replace existing bridges
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many concrete elements will the tunnel consist of?
100
120
89
50
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the weight of all 79 standard tunnel elements combined?
10 million tons
5.7 million tons
7 million tons
3 million tons
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which companies are responsible for the excavation of the tunnel trench?
Volkswagen and BMW
Boskalis and Van Oord
Siemens and Bosch
Maersk and Shell
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the capacity of the largest backhoe dredgers used in the project?
50 cubic meters
20 cubic meters
60 cubic meters
37 cubic meters
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How will the tunnel impact travel times between Denmark and Germany?
Reduce travel time from 50 minutes to 10 minutes by car
Reduce travel time by 50%
Increase travel time by 50%
Have no impact on travel time
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What environmental benefit is expected from the tunnel?
Increase in marine pollution
Increase in CO2 emissions
Reduction of 160,000 tons of CO2 annually
No change in CO2 emissions
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?