1.
What do you need to get before you can start a building project
a)
rights to build
b)
planning consent
c)
permission to construct
2.
who will inspect the work as it proceeds to ensure it is to regulation
a)
H&S inspector
b)
Building inspector
c)
surveyor
3.
What is pictured
a)
Datum
b)
Level peg
c)
Setting out profile
4.
What do you call the lines used for setting out
a)
building lines
b)
spray lines
c)
ranging line
d)
string lines
5.
which plan would you use to set out the position of a building
a)
location plan
b)
site plan
c)
block plan
d)
detail plan
6.
What type of hammer would you use to knock pegs in with
a)
claw hammer
b)
brick hammer
c)
club/lump hammer
d)
scutch hammer
7.
which method would you use to check a 90 degree right angle
a)
3:4:5
b)
5:6:7
c)
2:4:6
d)
3:6:9
8.
which of the following is NOT an underground service
a)
electric
b)
gas
c)
water
d)
radon
9.
what is the name of the line set buy planning which you must not build in front of
a)
datum line
b)
building line
c)
level line
d)
ranging line
10.
what is the procedure of removing the top soil from the setting out area
a)
site level
b)
site clearance
c)
site strip
d)
site prepare
11.
why do we measure the diagonals when setting out
a)
to check the building is square
b)
to check the building is the right size
c)
to check for level