NEW
Font size
S
M
L
XL
WorksheetsSDLC
Total questions: 15
Worksheet time: 9mins
Name
Class
Date
1.
What does SDLC stand for?
a)
Software Development Love Cycle
b)
Software Development Life Cycle
c)
Saturdays Do Live Cautiously
d)
System Dongle Life Cycle
2.
Which of these is the correct order of the SDLC?
a)
Specfication requirements, Design, Implementation, Testing, Evolution
b)
Feasibility, Design, Implementation, Testing, Evolution
c)
Creation, Testing, Evolution
d)
Specfication requirements, Design, Implementation, Evolution
3.
What happens in the design phase?
a)
The code is produced
b)
Making changes when the sotware has been created
c)
Planning the solution, look and feel of the software interface
d)
Ensuring the requirements are understood
4.
What happens in the testing phase?
a)
The code is tested against the specfication
b)
Making changes when the software has been created
c)
Planning the solution, look and feel of the software interface
d)
Ensuring the requirements are understood
5.
What happens in the implementation phase?
a)
The code is tested against the specfication
b)
Making changes when the sotware has been created
c)
Planning the solution, look and feel of the software interface
d)
The deliverables of the implementation stage are created e.g. the code
6.
What stage comes after the design stage?
a)
Testing
b)
Implementation
c)
Specification requirements
d)
Evolution
7.
What stage comes after the testing stage?
a)
Testing
b)
Implementation
c)
Specification requirements
d)
Evolution
8.
Which life cycle is this?
a)
Spiral
b)
Waterfall
c)
Incremental
d)
V-shaped
9.
Which life cycle is this?
a)
Spiral
b)
Waterfall
c)
Incremental
d)
V-shaped
10.
Which life cycle is this?
a)
Spiral
b)
Waterfall
c)
Incremental
d)
V-shaped
11.
Which of these is not a similarity between the v-shaped model and the waterfall model?
a)
It is easy to understand
b)
Have requirements
c)
Little flexibility
d)
Testing is applied throughout
12.
Which of these models has multiple development cycles happening simultaneously?
a)
Waterfall
b)
Incremental
c)
V-shaped
d)
Spiral
13.
Which of these cycles would be useful for a small business?
a)
Waterfall
b)
Incremental
c)
Spiral
d)
V-shaped
14.
Which of these is an advantange of the spiral model?
a)
Its expensive for small businesses
b)
Simple and easy to use
c)
It is a linear spiral
d)
Iterative nature means testing and evaluating is repeated
15.
Which of these is a disadvantage of the v-shaped model?
a)
Small businesses can use this
b)
Very little flexibility
c)
Can be costly
d)
Each phase of the iteration is fixed
Reset
