wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

EDP Quiz

Total questions: 20

Worksheet time: 45mins

Name
Class
Date
1.

The engineering process begins...

a)

when a team brainstorms new ideas.

b)

when a team identifies the need or solution to a problem.

c)

when a team develops a prototype.

d)

when a team makes iterations to their prototype.

2.

Which word best describes a constraint?

a)

option

b)

standard

c)

opportunity

d)

restriction

3.

In order to develop ideas for a basketball shoe, a design team visits three different shoe stores and studies design features. What part of the design process is this?

a)

Research

b)

Define

c)

Select

d)

Iterate

4.

What does iterate mean?

a)

test prototype

b)

improvise results

c)

improve based on feedback

d)

evaluate results

5.

An engineering team should brainstorm for a single solution.

a)

True

b)

False

6.

What word best describes criteria?

a)

requirements

b)

restrictions

c)

results

d)

define

7.

Some scientists want to design a system of instruments that will evaluate ocean currents, temperatures and winds in order to predict weather patterns. What should they do before they produce a prototype?

a)

Communicate the solution.

b)

Brainstorm possible solutions.

c)

Select the most promising solution.

d)

Define the problem.

8.

Which EDP step do you experiment with the prototype and record data?

a)

Test

b)

Select

c)

Identify

d)

Research

9.

When finding a solution to the design problem there is/are usually...

a)

only one possible solution.

b)

many possible solutions.

c)

only one or two solutions.

d)

exactly five solutions.

10.

Evaluate means...

a)

to define a problem.

b)

to eliminate a solution.

c)

to select.

d)

to examine or judge.

11.

During which step of the design process would a team describe their solution to an audience?

a)

Identify

b)

Select

c)

Communicate

d)

Brainstorm

12.

A prototype is an...

a)

original model.

b)

copy of a previous model.

c)

construction project.

d)

data from testing.

13.

A team of engineers is asked to design a scooter for less than $30. They are required to use recycled materials. Which of the following is the team's constraint?

a)

the scooter

b)

cost less than $30 to produce

c)

made out of recycled materials

d)

designed to appeal to kids

14.

A small group of people start sharing ideas. All suggestions are written down for further consideration. What step is this?

a)

Select

b)

Communicate

c)

Prototype

d)

Brainstorm

15.

If your first prototype doesn't solve the problem, you must go back and improve your plan. Which step is this?

a)

Constraints

b)

Iterate

c)

Criteria

d)

Brainstorm

16.

In which step do you evaluate the prototype and ask for feedback?

a)

Research

b)

Communicate

c)

Test

d)

Brainstorm

17.

An emergency-equipment company makes warning-signal flares. The company wants to redesign a flare so that it produces light for a longer period of time. After the company thinks of ideas, what is the next step in the design process?

a)

Select the most promising idea

b)

Brainstorm ideas

c)

Prototype a solution

d)

Test the design

18.

A group of engineers designed and constructed a flying car prototype. Their goal is for the car to enable people to safely fly to and from work instead of getting stuck in traffic jams. How will the engineers determine that this prototype meets their design requirements?

a)

Have a test pilot attempt to fly it from one location to another.

b)

Drive in the car at highway speeds on an interstate at nighttime.

c)

See if the car can start.

d)

Drive it slowly on the highway.

19.

What is the purpose of building a prototype?

a)

To determine the design constraints for the product.

b)

To make sure the product is in compliance with the government.

c)

To test the product and make sure it is the best solution to the problem.

d)

To determine the design criteria for the product.

20.

A factory produced a new type of refrigerator designed to use less electricity. The machine was manufactured and sold to the public at Target, Wal-Mart and Kohl's. After several months, reports showed that this refrigerator was not working correctly.

a)

The proper cost analysis was not preformed.

b)

They did not rigorously test and modify the prototype.

c)

The designers did not test other types of machines.

d)

Proper brainstorming was not conducted.