Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

PROJEK TAHUN AKHIR II - PENYEDIAAN PAPAN LITAR BERCETAK (PCB)

Total questions: 8

Worksheet time: 4mins

Name
Class
Date
1.

APAKAH LANGKAH PERTAMA PENGHASILAN PROJEK?

a)

MENYEDIAKAN KOMPONEN

b)

MEMBINA LITAR SKEMATIK

c)

MEMBINA LITAR PCB MELALUI PERISIAN

d)

MEMOTONG PAPAN PCB

2.

PERISIAN YANG BUKAN DIGUNAKAN UNTUK MEREKABENTUK LITAR PCB ADALAH ....

a)

PROTUES

b)

ARDUINO

c)

LIVEWIRE

d)

PCB WIZARD

3.

KERTAS YANG DIGUNAKAN UNTUK MENCETAK LITAR PCB ADALAH ...

a)

GLOSSY

b)

LUKISAN

c)

TRACING

d)

GRAF

4.

APAKAH JENIS PCB YANG SESUAI DENGAN MENGGUNAKAN MESIN UV?

a)

SINGLE LAYER PCB

b)

DOUBLE LAYER PCB

c)

PCB BIASA

d)

Presensitized PCB

5.

MASA YANG SESUAI BAGI MELETAKKAN PCB DIATAS PERMUKAAN UV EXPOSURE ADALAH ....

a)

120 SAAT

b)

70 SAAT

c)

30 SAAT

d)

5 SAAT

6.

APAKAH TUJUAN PROSES DEVELOP?

a)

SINGKIR LAPISAN PEKA CAHAYA PADA PCB

b)

SINGKIRKAN LAPISAN KUPRUM

c)

MEMBENTUK LITAR PCB YANG BOLEH DIPATERI

d)

MENGUATKAN PAPAN PCB

7.

BERAPAKAH KUANTITI AIR BAGI MELARUTKAN 25G SODIUM ASILICATE?

a)

2000 ml

b)

1000 ml

c)

500 ml

d)

25 ml

8.

APAKAH ITU PROSES ETCHING?

a)

MEMBENTUK LITAR PCB PADA PAPAN LITAR BERCETAK

b)

MEMBUAT REKAAN LITAR SKEMATIK PROJEK

c)

MENYINGKIRKAN LAPISAN PEKA CAHAYA PADA PCB YANG TELAH DIDEDAHKAN KEPADA SINAR UV.

d)

MENGHAKIS LAPISAN KUPRUM PADA PCB YANG TIDAK DILINDUNGI OLEH CETAKAN LITAR YANG TERHASIL MELALUI PROSES DEVELOPER.