wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

6 - Test Management

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is an advantage of using independent testers?

a)

Independent test teams are responsible for ensuring timely completion of the test execution period

b)

Independent testers are often more effective at finding defects

c)

You don't need people with technical or business domain knowledge on an independent test team

d)

Independent testing relieves developers of any responsibility for quality

2.

What is the purpose of exit criteria?

a)

To know when a specific test has finished its execution

b)

To ensure that the test case specification is complete

c)

To set the criteria used in generating test inputs

d)

To determine when to stop testing

3.

Which of the following would NOT normally form part of a test plan?

a)

Features to be tested

b)

Quality plans

c)

Risks

d)

Schedules and deadlines

e)

Test environment properties

4.

Enough testing has been performed when:

a)

Time runs out

b)

The required level of confidence has been achieved

c)

No more faults are found

d)

The users won’t find any serious faults

5.

We split testing into distinct stages primarily because:

a)

Each test stage has a different purpose

b)

It is easier to manage testing in stages

c)

We can run different tests in different environments

d)

The more stages we have, the better the testing

6.

In prioritising what to test, the most important objective is to:

a)

Find as many faults as possible

b)

Test high risk areas

c)

Obtain good test coverage

d)

Test whatever is easiest to test

7.

IEEE 829 test plan documentation standard contains all of the following except

a)

Test Items

b)

Test deliverables

c)

Test tasks

d)

Test specifications

8.

Which of the following belongs in the incident description section of an IEEE 829 standard-compliant incident report?

a)

The item pass/fail criteria

b)

The expected results and the actual results of a test

c)

All project risks

d)

The degree to which a system or component accomplishes its designated functions within given constraints regarding processing time and throughput rate

9.

What is an incident?

a)

A flaw in a component or system that can cause the component or system to fail to perform its required function

b)

Any event occurring that requires investigation

c)

Deviation of the component or system from its expected delivery, service or result

d)

The physical or functional manifestation of a failure Learning objective: IEEE 829 standard

10.

There are eight document types in the IEEE 829 standard except:

a)

Software Design Specification

b)

Test Case Specification

c)

Test Log

d)

Test Incident Report

e)

Test Summary Report