1.

Based on present conditions, what action should be taken with respect to the RCPs?

a)

Secure 2P32A

b)

Secure 2P32C

c)

Secure 2P32A and C

d)

Secure all RCPs

2.

At the end of SPTAs what should be the heat removal method from the RCS?

a)

MSSVs

b)

SDBCS to condenser

c)

SDBCS Upstream ADV

d)

SDBCS Upstream MOV

3.

At the end of SPTAs, what source of feedwater should be supplying the SGs?

a)

MFW

b)

2P7A

c)

2P7B

d)

AFW

4.

What procedure should be entered after SPTAs are complete?

a)

Functional Recovery

b)

SGTR

c)

Primary to Secondary AOP

d)

Natural Circulation AOP

5.

What ACA should be addressed 1st?

a)

2K11-C2, Reverse Rotation

b)

2K11-A10, Secondary System Radiation

c)

2K11-G5, RCP Bleedoff Pressure High

d)

2K02-A13, Seal Steam Pressure Low

6.

At the end of SPTAs, which safety functions will not be satisfied?

a)

IC, RCS HR, and Containment

b)

IC, Core HR, and Containment

c)

IC, PC, and RCS HR

d)

IC, Core HR, and RCS HR

7.

Based on present plant conditions what is the 1st action that should be taken to maximize RCS inventory?

a)

Start 2P89B

b)

Open green HPSI injection MOVs

c)

Spray to lower RCS pressure

d)

Close 2CV-4820-2, letdown isolation

8.

What action should be taken to ensure the RCS heat removal safety function remains met?

a)

Set the SDBCS master to Auto Local @960 psig

b)

Override and close EFW to A SG

c)

Ensure EFW supplies >485 gpm to at least one SG

d)

Trip MFPs

9.

What action should be taken to prevent steaming to atmosphere?

a)

Open 2CV-0233, seal steam bypass

b)

Locally open 2CV-0234, seal steam pressure control valve

c)

Start 2C-5B vacuum pump

d)

Open 2CV-0230, seal steam supply from U1

10.

What major recovery strategy should be priority 1 following the post-SPTA brief?

a)

Perform cooldown to SDC

b)

Reduce RCS pressure below the MSSV setpoint

c)

Cooldown and isolate the A SG

d)

Cooldown and isolate the B SG

11.

What EAL should be declared? (SRO/STA only)

a)

None

b)

NUE based on EAL SU7

c)

Alert based on EAL FA1

d)

SAE based on EAL FS1

e)

NA (For RO's)