WorksheetsPOST TEST SCM 300 WEEK 5
Total questions: 10
Worksheet time: 8mins
Repetitive manufacturing is mainly used for production scenarios with, except..
High product stability
High repetition rates
High product complexity
Low product complexity
To defines the planned material consumption for the components in master data..
Work center
Routing
Material
BOM
Last step in process flow in repetitive manufacturing
Final confirmation and goods receipt
Settlement using production cost collector
Material staging
Requirements
Cost posted on post production cost, except..
Material cost
Product cost
Overhead cost
Production activities cost
Basic functions of repetitive manufacturing, except
Action control
Scheduling
Costing
Period-end closing
To determine the work in process you can use
Make-to-stock production
Sales order based repetitive
Operational method
Work action control
In ECC systems there are two different routing, which routing that only for organizational purposes
Special routing
Standar routing
Rate routing
There is no answer
Routing in repetitive manufacturing often have … operation
Two
Full
Many
One
You can choose ….. to go to a separate material overview displaying the exception message and the days supply situation
Material cost
Material overview
Kanban control
Production planning
The pull-list enables processing using…
Transfer postings at storage location level
Warehouse management
Kanaban component
APO product planning