Font size
WorksheetsAssessment - Planning
Total questions: 12
Worksheet time: 7mins
What is the correct option related to Material Used on Master data set up ? (only for Brazil)
Reasale : Material produced in house with imported raw material
Industrialization : Imported Material to sell in local marketing
Reasale : Imported material to be used as raw material
Industrialization : Material produced in house or Raw material to be used for production
What is correct set up for production receipts through Dow to Dow processes and where the information can be found?
Procurement Type E/Storage Location/MRP2
Procurement Type F/SPK/MRP2
Procurement Type E/Storage Location/MRP2
Procurement Type E/SPK/MRP2
What is the impact with wrong "material origin" set up and where the information is set ? (only for Brazil)
Resolução 13/Accounting 2
Import Duties/Accounting 1
Resolução 13/Accounting 1
NCM/Foreign Trade
How can you find the NCM code on Gmid set up?
MM03/Foreign trade import
MM03/Accounting 2
VD03/Data Control
None
What is the correct option below related to STO types to create intra-company transfers and inter-company sales respectively?
ZUB/ZUBW
ZIC/ZUB
ZUB/ZIC
Does not apply
Which route must be used for virtual STO return?
Same route the item to be returned
You need to request a return specific route
Generic route
Virtual return does not contain any route
How we can find the units of measure registered for a GMID?
MM03/additional data
MD04
MMBE/Batch number
MM02/Basic data 1
How can you block a Gmid to not allow sales order entry ?
MM02/Sales org.1/X-distr.chain status/Z2
MM02/MRP1/Plant-sp-matl status/Z9
MM02/Sales org1/DChain-spec. status/Z2
None
For Brazil STOs, where can we find Material Usage field?
Item level/ Additional Fields tab
Item level/Brazil tab
None, Material Usage is found at Material Master only.
Which is the condition used to include the freight value in a virtual return item?
ZIIP
ZFSC
ZFCS
ZIIB
In a route to be used for STOs, what does the "Transit Duration" have to be considered ?
Time from Goods Issue until delivery at destination plant
Time from TPD until delivery at customer's site
Time from DN creation until delivery at destination Port
Which is the recommended method to udpate delivery dates on in-transit STOs?
Create Order Acknowledge, with updated delivery date on each item of STO.
Create New deliveries
Reject the STO
