wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Assessment - Planning

Total questions: 12

Worksheet time: 7mins

Name
Class
Date
1.

What is the correct option related to Material Used on Master data set up ? (only for Brazil)

a)

Reasale : Material produced in house with imported raw material

b)

Industrialization : Imported Material to sell in local marketing

c)

Reasale : Imported material to be used as raw material

d)

Industrialization : Material produced in house or Raw material to be used for production

2.

What is correct set up for production receipts through Dow to Dow processes and where the information can be found?

a)

Procurement Type E/Storage Location/MRP2

b)

Procurement Type F/SPK/MRP2

c)

Procurement Type E/Storage Location/MRP2

d)

Procurement Type E/SPK/MRP2

3.

What is the impact with wrong "material origin" set up and where the information is set ? (only for Brazil)

a)

Resolução 13/Accounting 2

b)

Import Duties/Accounting 1

c)

Resolução 13/Accounting 1

d)

NCM/Foreign Trade

4.

How can you find the NCM code on Gmid set up?

a)

MM03/Foreign trade import

b)

MM03/Accounting 2

c)

VD03/Data Control

d)

None

5.

What is the correct option below related to STO types to create intra-company transfers and inter-company sales respectively?

a)

ZUB/ZUBW

b)

ZIC/ZUB

c)

ZUB/ZIC

d)

Does not apply

6.

Which route must be used for virtual STO return?

a)

Same route the item to be returned

b)

You need to request a return specific route

c)

Generic route

d)

Virtual return does not contain any route

7.

How we can find the units of measure registered for a GMID?

a)

MM03/additional data

b)

MD04

c)

MMBE/Batch number

d)

MM02/Basic data 1

8.

How can you block a Gmid to not allow sales order entry ?

a)

MM02/Sales org.1/X-distr.chain status/Z2

b)

MM02/MRP1/Plant-sp-matl status/Z9

c)

MM02/Sales org1/DChain-spec. status/Z2

d)

None

9.

For Brazil STOs, where can we find Material Usage field?

a)

Item level/ Additional Fields tab

b)

Item level/Brazil tab

c)

None, Material Usage is found at Material Master only.

10.

Which is the condition used to include the freight value in a virtual return item?

a)

ZIIP

b)

ZFSC

c)

ZFCS

d)

ZIIB

11.

In a route to be used for STOs, what does the "Transit Duration" have to be considered ?

a)

Time from Goods Issue until delivery at destination plant

b)

Time from TPD until delivery at customer's site

c)

Time from DN creation until delivery at destination Port

12.

Which is the recommended method to udpate delivery dates on in-transit STOs?

a)

Create Order Acknowledge, with updated delivery date on each item of STO.

b)

Create New deliveries

c)

Reject the STO