MAINSAVER 12.6 WEB MODULE TRAINING RECORD: NON ENGINEERS

Total questions: 12

Worksheet time: 16mins

Name
Class
Date
1.

How many attempts do you have to input the correct password before you are locked out of your Mainsaver account?

a)

3

b)

4

c)

5

d)

1

2.

Can Mainsaver Web Module be accessed through another method other than through Citrix?

a)

Yes - Through URL link because Mainsaver Web Module is hosted on a local server

b)

No - Mainsaver Web Module runs through Citrix Only

3.

When raising a Work Order what type of detail should be included in the Work Requested Field?

a)

What you heard, smelled or felt at the time of failure or leading up to the equipment issue, along with the specific part of the equipment.

b)

That you want an engineer to fix your equipment ASAP

c)

Vague two word sentence

4.

When raising a Work Order through the Asset Drill down, what are the main minimum required fields for entry that Production/Hygiene must complete in order to submit?

a)

(1) Asset Number (2) Asset Status (3)Plan Priority (4)Work Requested box

b)

(1) Asset Number (2) Telephone number

c)

(1) Work Requested field (2) Action Code field (3) Fault Code field

5.

Work Orders that have the status Closed (CLO) can be viewed where within Web Module?

a)

Work Orders

b)

WO Viewer

6.

When should you raise a Work Order (think carefully about this question)

a)

IMMEDIATELY - Before calling an engineer, and as soon as possible when noticing a machine fault

b)

AFTER you call an Engineer and several hours after the machine has incurred damage (this is what is currently occurring)

7.

You have up to 2 minutes to answer this question


3 out of the 4 people below are Mainsaver Super Users. These superusers can be contacted if you need your Mainsaver Web Module password reset.


Please select them.

a)
b)
c)
d)
8.

What does the Work Order Status GAP mean? (See image)

a)

Engineers have been slow in carrying out the Work Order job

b)

The Work Order cannot be completed due to Engineers not being provided a gap in production for them to work within

9.

From an ENGINEERING perspective, what is the key purpose of Mainsaver?

a)

To record the number of jobs Engineers carry out

b)

To identify the failure modes occurring within equipment, from which effective maintenance tasks can be added to a preventative maintenance schedule to reduce equipment failure

10.

What does the Work Order Status field 'CMP' mean?

a)

The Engineer has not done the repair yet and therefore the Work Order has NOT yet begun

b)

The Work Order has been completed

c)

The Work Order is still in a state of breakdown

11.

You have up to 3 minutes to answer this question


Please tick the 4 statements which apply:


The main goal of this Mainsaver Refresher session is for you to understand that:

a)

GAP Work Order status indicates that a Production gap is required for engineers to complete the job

b)

Work Orders must be categorised in appropriate Plan Priority categories

c)

Due dates tell you know when a job should be completed

d)

Going forward, Engineering work will only be carried out if Production/ Hygiene raise a Mainsaver Work Order ticket

e)

Mainsaver Work Orders can be raised AFTER calling an engineer to complete a job

12.

If when raising a Work Order what do you select under 'Work Group' drop down?

a)

Your department example- 'Technical' , 'Hygiene', 'Production', 'Supply Chain' etc

b)

'Engineering' - as it is Engineering who would carry out the repair