PBC Pop Quiz Day 2

Total questions: 10

Worksheet time: 3mins

Name
Class
Date
1.

"How a process is performed to provide confidence that quality requirements are being met" is...

a)

Quality Planning

b)

Quality Improvement

c)

Quality Control

d)

Quality Assurance

2.

The SCMU includes staff from which organization(s)?

a)

Alberta Transportation

b)

Mainroad

c)

WSP

d)

Mixture of all

3.

How much of the lump sum is at risk?

a)

$1M per month

b)

A quarter of the monthly payment

c)

20% of the entire lump sum

d)

All of it

4.

Which of these is not a criteria in the annual performance review?

a)

Safety

b)

Responsiveness

c)

Innovation

d)

Risk

5.

In the context of the contract, what is a defect?

a)

Completed work that has failed

b)

Something contributing to a reduction in the specified level of service

c)

A breach of the OPM requirement

d)

Faults resulting in a non-compliance

6.

When does the 'Maximum Time for Defect Repair' timing end?

a)

When permanent repair of the defect is programmed

b)

When the repair is completed

c)

When someone has assessed the defect

d)

When the defect is forgotten about

7.

Which word best describes how Provisional Maintenance should be programmed?

a)

Collaboratively

b)

Autocratically

c)

Democratically

d)

Autonomously

8.

After being provided a list of audit sections, how long do the SCMU have to complete audit inspections?

a)

One week

b)

One month

c)

Ten days

d)

48 Hours

9.

How long is a typical audit section?

a)

1 centreline kilometer

b)

5 centreline kilometers

c)

2 lane kilometers

d)

10 lane kilometers

10.

How many non-compliances will result in a payment adjustment?

a)

Ten

b)

It depends on the number and their severity

c)

One

d)

When at least half of the OPMs fail