1.

What is recommended size for The Development Team (within the Scrum Team)?

a)

9

b)

Minimal 7

c)

7 +/- 2

2.

Who should know the most about the process toward a business objective or a release, an be able to explain the alternatives most clearly?

a)

The Scrum Master

b)

The Product Owner

c)

The Development Team

d)

The Project Manager

3.

When the Sprint is over?

a)

When all Product Backlog items meet their definition of done

b)

When the time-box expires

c)

When all the tasks are completed

d)

When the product Owner says it is completed

4.

What questions should be answered in the stand-up meeting?

a)

What will I do today?

b)

What did I do yesterday?

c)

Do I see any impediment?

d)

What worked well?

e)

What could be improved?

5.

What happens during Sprint 0?

a)

Overall planning, base system architecture, base design, version control and continuous integration setup.

b)

Establish base system architecture and design, install version control and continuous integration setup.

c)

Base system architecture and design.

d)

There is no such thing as Sprint 0.

e)

Requirements gathering, version control setup, and continuous integration setup.

6.

The time-box for a Daily Scrum is?

a)

15 minutes for a 4 week sprint. For shorter Sprints it is usually shorter.

b)

Two minutes per person.

c)

4 hours.

d)

15 minutes.

7.

Who has the authority to cancel a Sprint?

a)

Product Owner

b)

Scrum Master

c)

Development Team

d)

All roles togethe

8.

What is the purpose of the Daily Scrum / Daily Stand-up?

a)

To provide status updates to the Product Owner and ScrumMaster.

b)

To get work assignments for the day.

c)

To get all of the developers' questions from the day before answered.

d)

To plan work for the next 24 hours, optimize team collaboration and performance through inspection of progress, and forecast upcoming Sprint work.

9.

Which is the most popular methodology for Agile

a)

Waterfall

b)

SDLC

c)

ScrumBan

d)

Scrum

10.

What is a requirement for Scrum

a)

Using JIRA

b)

Being disciplined in applying the process

c)

Having a separate Scrum master

d)

Having 4-weeks sprints

11.
What is the product backlog? 
a)
A list of team members
b)
A list of marketing ideas
c)
A list of requirements for the product
d)
A list of potential scrum masters
12.
At the end of every sprint... 
a)
An activity needs to be completed
b)
There is a potential shippable product 
c)
The team moves on without looking back 
d)
The teams go out for a drink
13.
What is a sprint? 
a)
An activity specific phase during a project
b)
This persons is the tester of the product 
c)
Similiair to the product owner 
d)
Fixed length (in time) itirations 
14.
Who is the Scrum Team?
a)
Scrum Master
b)
Product Manager
c)
The Development Team
d)
Project Manager
e)
The Product Owner
15.

What are are the different scrum events

a)

Stand-up, Group coding, Back log refinement , Sprint Retrospective

b)

Daily Scrum, Group coding, Back log refinement , Sprint Retrospective

c)

Daily Scrum, Sprint Review, Back log refinement , Sprint Retrospective

d)

Daily Scrum, Sprint Review, Sprint Planning, Sprint Retrospective

16.

Who writes tests in a Scrum Team?

a)

The Scrum Master

b)

The Development Team

c)

Coders

d)

QA specialists

17.

What is at the heart of scrum?

a)

Testing

b)

Sprint planning

c)

Daily Scrum

d)

Sprint

18.

When should a retrospective meeting be held?

a)

Only at the end of a release

b)

At the end of each sprint, before the sprint review meeting

c)

At the end of each sprint, after the sprint review meeting

d)

Only at the end of a project

19.

How often should backlog grooming occur?

a)

Once, at the beginning of the project

b)

Once, at the end of the project

c)

Every Sprint

d)

Every release cycle

20.

Who runs the Scrum Team?

a)

The Product Owner

b)

Trey Keller, Android Mobile Web Cart Integration Tech Lead and Proud Supporter of Jimmie Johnson and the #48 Ally NASCAR team

c)

The Development Lead

d)

None of the Above