1.

When taking over a shift, the boiler operator must first check the ___.

a)

steam pressure

b)

fuel oil supply

c)

water level on all boilers

d)

bottom blowdown valves

2.

The low-water fuel cutoff can be tested by blowing down the low-water fuel cutoff or by ___.

a)

securing the feedwater and allowing the water level in the boiler to drop

b)

closing the blowdown valves

c)

modulating the firing rate

d)

a hydrostatic test

3.

In order to prevent uneven expansion of the boiler on cold startup, the boiler must be ___.

a)

warmed up as quickly as possible

b)

thoroughly vented

c)

heated using steam from outside sources

d)

warmed up slowly

4.

During startup, the boiler vent should remain open until a pressure of approximately ___ is reached.

a)

0.1 psi

b)

15 psi

c)

50% of the MAWP

d)

75% of the MAWP

5.

A safety valve can be manually tested when the ___.

a)

pressure is at least 25% of the MAWP

b)

pressure is at least 75% of the MAWP

c)

burner is going through the firing sequence

d)

boiler is down for inspection

6.

Boilers equipped with a superheater must be protected during warm-up by ___.

a)

keeping the superheater drain valve closed until the boiler is cut in on-line

b)

keeping the superheater drain valve open until the boiler is cut in on-line

c)

passing the feedwater through the superheater tubes

d)

bypassing the superheater tubes

7.

Superheaters are prevented from overheated by the circulation of ___.

a)

air

b)

steam

c)

water

d)

gases of combustion

8.

To ensure high heat transfer rates, ___ should be removed from boiler heating surfaces.

a)

flue gas

b)

condensate

c)

carbon dioxide

d)

soot

9.

During boiler shutdown, the ___ should be opened when the steam pressure in the boiler has dropped to 10 psi to 15 psi.

a)

safety valve

b)

free-blowing drain

c)

boiler vent

d)

bottom blowdown valve

10.

As the boiler is cooling down, the boiler operator must maintain ___.

a)

the NOWL

b)

the normal draft condition

c)

the normal feedwater temperature

d)

a 10% CO2 reading

11.

After a boiler has had major repair work done that could affect the boilers internals or has developed a low-water condition, it should be subjected to ___.

a)

an accumulation test

b)

a hydrostatic test

c)

an evaporation test

d)

both an accumulation and a hydrostatic test

12.

A ___ is used to used to verify the flame in a burner.

a)

thermodynamic trap

b)

flame scanner

c)

high limit control

d)

combustion air proving switch

13.

Boilers that are out of service for an extended period of time can be laid up with ___.

a)

the water level above the NOWL

b)

oxygen present to prevent corrosion

c)

carbon dioxide present to prevent corrosion

d)

dry lay-up

14.

Plant emergency procedures should be established by the ___.

a)

operator on duty

b)

insurance inspector

c)

ASME code

d)

chief engineer

15.

A low-water fuel cutoff ___.

a)

shuts off the water supply

b)

shuts off the fuel supply

c)

shuts off the condensate return

d)

shuts off the supply air

16.

A boiler that has experienced a low-water condition should be ___.

a)

thoroughly examined for signs of overheating

b)

thoroughly examined for scale buildup

c)

brought up to full steam pressure to test for leaks

d)

brought up to the NOWL

17.

A high-water condition can be corrected by ___.

a)

closing the main steam stop valve

b)

increasing the firing rate

c)

performing a bottom blowdown

d)

all of the above

18.

When performing a hydrostatic test, the pressure on the boiler should be increased to ___.

a)

1 1/2 times the safety valve setting

b)

2 1/2 times the safety valve setting

c)

2 times the working pressure

d)

6% above the MAWP

19.

If there is danger of the boiler freezing, the boiler should be laid up ___.

a)

with a light fire

b)

by using steam from the header to keep the boiler warm

c)

completely dry

d)

with antifreeze

20.

A furnace explosion can be caused by ___.

a)

excess draft

b)

a low-water condition

c)

loss of feedwater

d)

an accumulation of combustible gases

21.

The ASME Code recommends that boilers be inspected internally and externally every ___.

a)

six months

b)

year

c)

two years

d)

three years

22.

Maintenance work performed inside a boiler requires a(n) ___, which contains procedures based on safety considerations for workers.

a)

accident report

b)

boiler log

c)

inspector notice

d)

confined space permit

23.

New or retubed boilers should be cleaned with ___.

a)

alkaline detergent

b)

muriatic acid

c)

softened water

d)

compressed air

24.

The three ingredients needed to start a fire are fuel, heat, and ___.

a)

carbon dioxide

b)

combustible material

c)

nitrogen

d)

oxygen

25.

A fire caused by oil, gas, grease, or pain would be classified as a Class ___ fire.

a)

A

b)

B

c)

C

d)

D