Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Drive-Thru

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What are the 3 entry points of our DT Customers

a)

Pre-Order Zone, Order Zone, Entry Zone, Post-Order Zone

b)

Pre-Order Zone, Entry Zone, Order Zone,Post-Order Zone

c)

Entry Zone,Pre-Order Zone,Order Zone,Post-Order Zone

d)

Order Zone,Pre-Order Zone, Entry Zone, Post-Order Zone

2.

Order time and Payment time is a total of:

a)

50 seconds

b)

45 seconds

c)

65 seconds

d)

55 seconds

3.

Assembly time is a total of:

a)

60 seconds

b)

65 seconds

c)

55 seconds

d)

70 seconds

4.

The longer the queuing time, customers will be discouraged to stay in the line.

a)

True

b)

False

5.

DT experience starts when they enter the driveway and ends upon exiting our DT Driveway

a)

True

b)

False

6.

These are the services must be provided in every DT customers

a)

A. Speed of Service

b)

B. Accuracy

c)

Both A and B

7.

These are the important factors in achieving TAT

a)

A. Achieve Queuing time

b)

B. Achieve Assembly time only

c)

C. Maximize DT capacity

d)

D. Both A and C

8.

These are the DT time Standards

a)

Order: 30 secs, Payment: 25 secs, Assembly and pick up: 65 secs

b)

Order: 25 secs, Payment: 30 secs, Assembly and pick up: 60 secs

c)

Order: 35 secs, Payment: 20 secs, Assembly and pick up: 65 secs

9.

Longer queuing time will result to:

a)

Customer stay in the line

b)

Sales loss

c)

Customer delight

d)

Customer satisfaction

10.

DT Customers are:

a)

Always On-the-Go

b)

Expects clean driveway

c)

Expects good quality of products

d)

All of the above