wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

TIMSS 1 yr 9

Total questions: 8

Worksheet time: 16mins

Name
Class
Date
1.

Which of these is the BEST estimate of 7.21 ×3.8610.09\frac{7.21\ \times3.86}{10.09}  ?

a)

 7×310\frac{7\times3}{10}  

b)

 7×410\frac{7\times4}{10}  

c)

 7×311\frac{7\times3}{11}  

d)

 7×411\frac{7\times4}{11}  

2.

The pie chart shows the percentage of caps for sale at a sporting goods store. If there are 200 caps, what is the total number of caps that are either white or green?

a)

55

b)

100

c)

110

d)

145

3.

Th e table above shows the shadow lengths of four bushes of different heights at 10 a.m. What is the shadow length at 10 a.m. of a bush that has a height of 50 centimeters?

a)

36cm

b)

38cm

c)

40cm

d)

42cm

4.

Which of these could represent the expression 2x + 3x?

a)
b)
c)
d)
5.

Points A, B, and C lie on a line and B is between A and C. If AB = 10 cm and BC = 5.2 cm, what is the distance between the midpoints of AB and BC?

a)

2.4cm

b)

2.6cm

c)

5.0cm

d)

7.6cm

6.

How many degrees does a minute hand of a clock turn through from 6:20 a.m. to 8:00 a.m. on the same day?

a)

680

b)

600

c)

540

d)

420

7.

The solid line (____) on the graph shows car production by the NU Car Motor Company during a particular day. The dotted line (-----) shows what the total number of cars produced would be if the rate of production were constant. A. By what time had a total of 150 cars been produced? Answer: _______________

a)

9am

b)

10am

c)

11am

d)

12pm

8.

Th e solid line (____) on the graph shows car production by the NU Car Motor Company during a particular day. The dotted line (-----) shows what the total number of cars produced would be if the rate of production were constant. B. What was the average number of cars produced per hour on this day? Answer: _______________

a)

40

b)

50

c)

400

d)

500