Font size
WorksheetsSDLC
Total questions: 10
Worksheet time: 5mins
It is a process that consists of a series of planned activities to develop or alter the Software Products
Software Development Life Cycle
Life Cycle
Development Process
Graphical Representation
What does SDLC stands for?
Software Development Life Cycle
Software Deployment Life Cycle
System Deployment Life Cycle
System Development Life Cycle
Give at least 3 stages of SDLC
Planning
Deployment
Building
Scanning
Arrangement
It is the most important stage in SDLC
Deployment
Building
Defining
Planning
Incremental Model is the first process model to be introduced and is also referred to as a linear-sequential life cycle model.
False
True
It is an extension of waterfall model and is based on the association of a testing phase for each corresponding development stage.
Verification and Validation Model
Incremetal Model
Big Bang Model
Iterative Model
Each phases in waterfall model must be completed before starting the next phase.
True
False
This is based on feedback whether the product may be release as it is or with suggested enhancements in the targeting market segment.
Deployment in the Market and Maintenance
Testing in the Product
Planning and Requirement Analysis
Developing the Product
A design approach clearly defines all the architectural modules of the product along with its communication and data flow representation with the external and third party modules.
Designing the Product Architecture
Waterfall Model
Testing the Product
Building or Developing the Product
SRS means Software Requirement
Specification
System
Software
Survey
