wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Track Engineering - Ballast & Drainage

Total questions: 10

Worksheet time: 6mins

Name
Class
Date
1.

What is the typical size of ballast?

a)

10mm

b)

70mm

c)

100mm

d)

25mm - 64mm

2.

What are the functions of ballast? (Select more than one)

a)

Free draining

b)

Allows the track to be adjusted by manual/mechanical means

c)

Gives vertical and lateral stability to the track

d)

To make the track look neat and tidy

3.

What are the properties of ballast? (Select more than one)

a)

Angular, strong and durable

b)

Regular in size

c)

Smooth

d)

Shiny

e)

Well consolidated

4.

What is the minimum shoulder width?

a)

375mm - 450mm

b)

250mm

c)

450mm - 600mm

d)

1m - 1.5m

5.

What is the minimum shoulder height?

a)

250mm

b)

300mm

c)

1m

d)

125mm

6.

Drainage should allow water to disperse away from the railway and prevent flooding...

a)

True

b)

False

7.

What is the minimum crossfall in the track substructure?

a)

1:5

b)

1:500

c)

1:20

d)

1:100

8.

What is the purpose of a catchpit? (Select more than one)

a)

To allow inspection and cleaning

b)

To supply clean water to the environment

c)

To protect the ballast membrane

d)

To allow drains to be kept clean and free of debris

9.

What evidence is there of a blocked drain? (Select more than one)

a)

Catchpit full of ballast

b)

Dry catchpits

c)

Flooded catchpits

d)

Vegetation growing in the four foot

10.

How can we locate blocked drains? (Select more than one)

a)

Visual inspection

b)

Cameras

c)

Throw ballast down the catchpit

d)

Water dye test