wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

PCFS DS OER2

Total questions: 10

Worksheet time: 2mins

Name
Class
Date
1.

What is the eIDEA platform?

a)

Platform that support entry point for all idea for improvement

b)

Platform that support only new equipment installation idea in plant for improvement

2.

How can we know if the handover shift activity has been carried out?

a)

By read and without close the eLOG.

b)

By read, comment and close the eLOG.

3.

Which is the POINT module that we used to know the non-routine job that need to be carried out during the shift?

a)

eGTASK

b)

eTASK

4.

Can POINT eTASK module link with OP or special Operating Instruction inside OEMS?

a)

Yes

b)

No

5.

What is the function of eGTASK?

a)

Specifically for HSE task

b)

Specifically for non-routine task

6.

How can the shift personnel communicate to the next shift group if he is unable to proceed with the task?

a)

To close the eTASK by change the status to "Completed".

b)

To close the eTASK by change the status to "Omitted".

7.

Can we check the number of eBSAFE done by a person?

a)

Yes

b)

No

8.

Can eMANNING address the issue of manpower planning?

a)

Yes

b)

No

9.

Which is the POINT Module that is used for Operating/Standing Instruction to be registered, informed and tracked?

a)

eLOG

b)

eTASK

10.

Can POINT track SCPD and PTW status?

a)

Yes

b)

No