WorksheetsSh?t We Need to Know ( VBA)
Total questions: 59
Worksheet time: 30mins
What year is the Building ACT
2001
1993
1994
2003
What year NCC Volume 2 should you use for a resource
2019
2010
Current
1993
What year are the plumbing regs
200
2018
1984
2001
What year are the building regs
2000
2002
2014
2018
What year is the domestic building contract Act
1995
1999
2000
2001
What is a Class 1 building
Apartment buildings.
Hotels, motels, hostels, backpackers' accommodation and student accommodation.
Houses , terrace houses, townhouses and guest houses
All the Above
What does Vol 2 of the NCC relate to
Pertains primarily to Class 1 and 10 buildings
Pertains primarily to plumbing and drainage associated with all classes of buildings.
Pertains primarily to Class 2 to 9 buildings.
All the Above
What is the A.S (Australian Standard ) for Residential footings and Slabs
AS 3700
AS 3740
AS 1684
AS 2870
What is the AS for Electrical
3700
2870
3000
1684
What is the AS for Residential Timber Framing
AS 3700
AS 2870
AS 1684
AS 2870
What is the order of the building Hierarchy
NCC- Building ACT-AS -REGS
Building Act 1993- Building Regs 2018- NCC Vol 2,-Australian Standards
AS- Building ACT- NCC -Building Regs
None of the Above
What Year is the OHS ACT
1990
2004
2008
None of the Above
Who is this guy
Lady Ga Ga
Billy Brownless
Bob Hawk
Franco Cozzo
What is the Purpose of the Building ACT 1993
To regulate the NCC
To regulate the A.S
To regulate Contracts
To regulate the Building Regs
To act like a building
*Regulate Building works and Standards
*Regulate Plumbing standards
*Regulate Cooling tower systems
*Regulate Surveyors
*Regulate Certificate and Accreditation of Plumbing works
None of the Above
When does Home Warranty insurance Kick in
Any building work over the amount of $10,000
Any building work over the amount of $20,000
Any building work over the amount of $16,000
Any building work over the amount of $25,000
How many years does H.W Insurance last after the completion of the work
5 years
8 years
6 years
10 years
What is the world's longest river
The Amazon
The Nile rive
The Yarra
South Wharf
What is Australia's second oldest city
Sydney
Perth
Hobart
Melbourne
When are engineers drawings needed for a retaining wall
1.2m
1.5 m in height
1m
2m
when is a permit required for a retaining wall
1m in height
1.5 in height
none of the above
700mm
On a plan what does DP relate to
Down Pipe
Damp Proof
Drill Pipe
Deep Pipe
What does DPC stand for
Dead pvc cap
Down pipe cover
Damp proof course
All the above
When receiving a plans there are always 2 types of drawings what are they
Architects and and Engineers plans
Engineering plans and no specs
Architects plans and landscape plans
Engineering plans
Is it beneficial to have a set of specifications with drawings
Who cares
Yes
Maybe
No
With variations what is the ideal scenario below
verbally agree on it
do it and worry about it later
Have both builder and owner sign off on it
All the above
If there is conflict in drawings is it best to
do nothing about it
Ahhh She'll be right
Report it with the Architect
start the scope of works
What is the name of Batman’s butler
Robin
Geives
Alfred
Morgan
What book would you find deemed to satisfy
NCC
Building Act
AS 3000
Building Regs
What order of Admin would you take before setting out site
Dig first , Dial before you dig, ask the boss
service plans, dig , service locator, dial before you dig
Insurance, Dial before you Dig,service plans , service locator, then dig
All of the Above
The erecting, altering and dismantling of scaffolds must be handled by a certified scaffolder for heights more than?
2m
3m
4m
1m
What is the minimum height of a riser in stair construction?
115mm
110mm
105mm
90mm
what is the max height of a riser
190mm
155mm
205mm
180mm
what is the max spacing of bar chairs
400mm
300mm
800mm
1m
how many days is a cooling off period
2 weeks
5 days
12 days
24 hours
What is a major Domestic building contracts
works over 20k
works over 10k
works over 5k
works over 16k
What is the max overhang for a bottom plate?
10mm
5mm
20mm
15mm
how often should leads be tested
1 month
3 months
2 years
12 months
Whats is a MSDS
Mcdonald's safety data sheet
Materials safety data sheet
metal .safety glass, datum
All the above
what is the max stair going
244mm
1m
355mm
255mm
whats the min height of a pool fence
1m
1.5m
1.2m
800mm
stagger of noggings should be no greater than
100mm
150mm
30mm
50mm
what is the max splice for trench mesh
500mm
300mm
200mm
400mm
what is the max splice for fabric mesh
400mm
600mm
500mm
200mm
What does a class M site relate to
max reactive
medium reactive
moderately reactive
all the above
what resource would you find deemed to satisfy in
Building regs
Building act
AS2870
NCC Vol 2
A vapour barrier must be what in thickness
.02mm
0.2mm
20mm
2m
A vapour barrier must be installed as follows
lap not less than 50 mm at all joints
lap not less than 100 mm at all joints
lap not less than 200 mm at all joints
lap not less than 300 mm at all joints
Concrete must
have a strength at 30 days of not less than 20 MPa
have a strength at 14 days of not less than 20 MPa
have a strength at 24 days of not less than 20 MPa
have a strength at 28 days of not less than 20 MPa
The clear width of a cavity between the masonry veneer and the exterior face of the supporting frame must be not less than
20mm
25mm
15mm
30mm
The location of a damp-proof course or flashing serving as a damp-proof course, must be not less than
100 mm above the adjacent ground level
50 mm above the adjacent ground level
200 mm above the adjacent ground level
150 mm above the adjacent ground level
Max spacing of weepholes is
1m
1.2
800mm
1.5m
Max spacing of brick ties is
500mm
1m
300mm
600mm
Stumps are defective if they are out of plumb vertically by more than
5mm in the first 1m
10mm in the first 1m
15mm in the first 1m
12mm in the first 1m
How wide must waterproofing be either side of a the junction
20mm
40mm
50mm
100mm
Max span for floor joist as per AS 1684 and NCC
450mm
400mm
500mm
none of the above
Openings in barriers (including decorative balustrades) must be constructed so that they do not permit a
120 mm sphere to pass through it
125 mm sphere to pass through it
150 mm sphere to pass through it
100 mm sphere to pass through it
what is the max going for stairs
255mm
355mm
400mm
210mm
Safety barriers must be installed if a swimming pool has a depth of water more than
200mm of water
300mm of water
400mm of water
1m of water
What are the sub-floor clearance requirements
150mm to 200mm
200mm to 500mm
100mm to 300mmm
150mm to 400mm