WorksheetsHSE Summit Round-2
Total questions: 10
Worksheet time: 5mins
In a certain stage of safety culture maturity, the organization believes that incidents are preventable
TRUE
FALSE
What is our organization's goal on the maturity of safety culture according to the Bradley's curve?
Reactive
Dependent
Independent
Interdependent
Who is called as a Safety Leader
CEO
Top Manager
Everybody
All are correct
The following steps are in accordance with CHSEMS, except:
Kick-Off Meeting
Pre-Mobilization Inspection
Work in Progress Audit
Internal Audit
The following rules are within the scope of workers according to the Live Saving Rules of Work Permit:
Make sure the work permit is valid
Understand and follow the work permit system
Make sure the work permit is suitable with the work/job
Give explanation about steps of work, hazards/ risks, and risks control
In order to achieve production target, Operation Manager asked Operator to run Crude Transfer Pump (CTP) although it has to postpone preventive maintenance schedule. What should Operator do?
Follow the instruction even though risk to breakdown a pump
Refuse the instruction and tell the reason
Go to the field and tell other operators to do it
Hide somewhere and return when the shift work ended
Who is responsible to implement full cycle of CHSEMS process?
Contractor HSE Department
Contractor's Top Management
Contract Owner
Operation Manager
Who has to provide training how to use Personal Protective Equipment (PPE) according to the Life Saving Rules?
Worker
Supervisor
HSE Training Specialist
Operation Manager
We do not need to conduct hazard identification prior to execute every job. It depends on risk level whether high, medium or low.
TRUE
FALSE
There was hydrocarbon leak (approx. 500 bbl) overflown from a storage tank during transferring process from a supply boat/vessel. This event is categorized and needs to be reported as Process Safety Event.
TRUE
FALSE