What is the first step of Establish Integrity Program?
Collect database
Establish database
Collect Data and Register Asset Database
Register asset
How many steps do Establish Integrity Program has?
5 steps
6 steps
7 steps
4 steps
Which roles has the most significant responsibilities in Establish Integrity Program?
MCI Engineering
Corrosion Engineer
Do Inspection
Technical Authority
Which steps that ‘Do Inspection’ has responsibilities to carry to?
3.1.1.6 Register integrity proactive maintenance (PM) program
3.1.1.5 Produce integrity master plan
3.1.1.1 Collect data and register asset database
3.1.1.4 Develop integrity plan
Any integrity activities which require operation action (e.g. collect sample) will be registered in POINT system (i.e. eTASK) link to OFWP 1.1.3 (VAT). Which steps has relation with this description?
3.1.1.6 Register integrity proactive maintenance (PM) program
3.1.1.5 Produce integrity master plan
3.1.1.2 Perform corrosion study
3.1.1.4 Develop integrity plan
Which step that requires for reference to OPMS Step 5.1.1 – 5.1.2 and Equipment Reliability Strategy (ERS) Template:-
3.1.1.5 Produce integrity master plan
3.1.1.6 Register integrity proactive maintenance (PM) program
3.1.1.3 Perform risk assessment
3.1.1.4 Develop integrity plan
In the step 3.1.1.5 Produce Integrity Master Plan, item as below will be considered as ‘input’:- (Select three (3) correct answers)
Approved annual Integrity Master Plan
Root Cause Failure Analysis (RCFA)
External requirement (e.g. Assurance Findings, statutory, TA / Shutdown Planning etc.)
Integrity Program (IRP & CMMP)
L3 Procedures are used as reference for execution of ‘Establish Integrity Program’ and majority of the L3 resides at step:-
3.1.1.6 Register integrity proactive maintenance (PM) program
3.1.1.5 Produce integrity master plan
3.1.1.3 Perform risk assessment
3.1.1.4 Develop integrity plan
Linkages from other IFI WP sub WP MStaR of 3.2.3 Establish CF Master Plan has been the ‘input’ for which step?
3.1.1.6 Register integrity proactive maintenance (PM) program
3.1.1.5 Produce integrity master plan
3.1.1.2 Perform corrosion study
3.1.1.4 Develop integrity plan
Which is the only sole step that requires Asset Integrity Technical Authority to be responsible for Initiation and Completion:-
3.1.1.3 Perform risk assessment
3.1.1.5 Produce integrity master plan
3.1.1.2 Perform corrosion study
3.1.1.4 Develop integrity plan