UNIT 2 - DCV50153

Total soal: 20

Worksheet time: 17mins

Nama
Kelas
Tanggal
1.

Choose the TECHNICAL PERSONNEL INVOLVED IN CONSTRUCTION..

a)

Structure Engineer

b)

Sailor

c)

Architect

d)

Land Rate Surveyor

e)

The Trades

2.

CLIENT ▪

Proposed a vague _______ of what the design of the construction project to be. As the __________ to the project.

a)

idea , financier

b)

plan , manager

c)

idea , management

d)

plan , financier

3.

As a supervisor you need to :

a)

Ensure that work carried out by workers are according to specified work specifications

b)

Look after staff welfare

c)

Made the report to 'Project Manager'

d)

Attend the meeting client and consultant

e)

Ensure the safety

4.

Choose the ARCHITECT job scope..

a)

Plan, construct and maintain every construction aspect such as building, highway, road, bridge, railway track, irrigation and drainage system, sewerage system, airport, port, tunnel, hydro generation system, docks and flood mitigation.

b)

Manage and supervise project and electrical installation work.

c)

Supervise construction works that are carried out by the contractor so that it comply with the work procedure that has been set in the architectural drawing

d)

Make perfect to any deficiency and maintenance of the construction work.

5.

QUANTITY SURVEYOR job scope are :...

a)

Prepare and check project cost estimation and control

total expenditure from designed that produced by the

architect.

b)

Prepare tender copy for the Tender Board.

c)

Prepare award document and conduct the awarding process.

d)

Prepare progress report and final report of the project.

e)

Prepare and check tender document, manage tender award, issue tender form and tender opening as well as carry out awarding process and receiving tender.

6.

Role :

Process, approve and alienate of the land title applications, subdivision of plot and change of land use, subdivision of plot and change of ownership, mortgage and lease of land.


Choose the AUTHORITIES with the above role..

a)

Local Authorities

b)

Public Work Department

c)

Cidb

d)

Land and Mineral Office

e)

None of the above

7.

Role :

▪ Provide infrastructure for irrigation and drainage

▪ Improve services in river engineering

▪ Install of river culvert, prevent deposition, deepening of the river basin, varies the installation of river culverts for mining, improve scenery around the river bank, update river networking and build other structure for food prevention.


Name the Authorities role above :

(a)  

8.

Choose the Authorities that using this Logo

a)

Department of Irrigation and Drainage

b)

Water Authority

c)

Department of Environment

d)

Public Work Department

e)

JPS

9.

Choose Authorities that using this LOGO..

a)

Jabatan Bomba Dan Penyelamat Malaysia

b)

Fire and Rescue Department Malaysia

c)

Badan Organisasi Mencegah Bencana Alam (BOMBA)

d)

Fire and Rescue Department Malawi

10.

Role :

▪ Approve plan and recommended Certificate of Fitness for occupation when associate with sewerage.

▪ Supervise sewerage services.

▪ Provide regulation, standard and specification for approval and installation of sewerage system


Choose the correct answer / LOGO :

a)
b)
c)
d)
e)
11.

3 types of CONSTRUCTION DELIVERY METHOD :

a)

Design, Bid & Built

b)

Design, Built & Services

c)

Design & Built

d)

Design, Bid & Operate

e)

Design, Built & Operate

12.

Design, Bid & Build is the most common method of construction procurement also known as (a)   and is well established and

recognized. The architect or engineer acts as the project coordinator. The role is

to design the works, prepare the specifications and produce construction

drawings, administer the contract, tender work and manage the work from

inception to completion.

13.

Chart shows the organization for one of the method in construction. Choose the correct answer.

a)

Design & Built

b)

Design, Bid & Built

c)

Design, Built & Operate

d)

Design, Bit & Built

14.

Write the 2 (two) advantages of Design, Built & Operate Method

4 lines
15.

In CIDB Registration, Each contractor is registered according to:

a)

Grade

b)

Category

c)

Special Item

d)

Classification Status

e)

Speciallization

16.

CIDB

There are three (3) contractor registration categories in cidb:

a)

Civil Engineering construction

b)

Construction of Buildings

c)

Mechanical and Electrical

d)

Mechanical and HVAC

e)

Electrical and Power

17.

When register as a contractor in CIDB, all the contractor are listed by using the status info in their license. The status is as follows:

a)

ACTIVE

b)

NON ACTIVE

c)

DORMANT

d)

NEW

e)

EXPERIENCE

18.

Select the correct Limit of Government Work Procurement Value

a)

G1 - RM200K - Above

b)

G2 - RM200,001 - RM500,000

c)

G3 - RM300,001 - RM 1M

d)

G2 - RM200,001 - RM300,000

e)

G7 - EXCEEDING RM10M

19.

When register the business with SSM, Business may be registered using _______________ or using a _______________.

a)

personal name & trade name

b)

Enterprise & Sdn. Bhd

c)

name (place) & business name

d)

Sdn. Bhd & Berhad

e)

Other name & Trading Name

20.

Select the correct answer... REGISTRATION FEE for SSM is :

a)

Sole proprietorship using personal name as stated in the identity card – RM30.00

b)

Sole proprietorship or partnership using trade name - RM60.00

c)

Registration of branches – RM5.00 for each branch

d)

Business Information Print-out – RM15.00

e)

Registration of branches – RM15.00 for each branch