WorksheetsCMMI 2.0 Quiz
Total questions: 20
Worksheet time: 11mins
Level 3 practices use organizational standards and tailoring to address project and
work characteristics.
TRUE
FALSE
There are three views in the CMMI model: Doing, Managing, and Enabling.
TRUE
FALSE
What Practice Area provides business value by helping to increase the objectivity of
decision making and the probability of selecting the optimal solution?
Causal Analysis and Resolution
Decision Analysis and Resolution
Governance
Monitoring an control
Practice Areas that are related are grouped in Capability Areas that can provide improved performance in the skills and activities of an organization or a project
TRUE
FALSE
Requirements Development and Management (RDM) practice 2.5 which reads "Develop, record, and maintain bidirectional traceability among requirements and activities or work products" requires use of a Requirements Traceability Matrix document.
TRUE
FALSE
The intent and value of each Practice Area must be met by writing a process for each Practice Area.
TRUE
FALSE
In an organization using agile methods such as Scrum, a release burndown chart showing the number of story points remaining would be a good example of the work remaining.
TRUE
FALSE
The identification of defects in Peer Reviews (PR) has a relationship to defects found in what other Practice Area:______
Defect Analysis
Causal Analysis and Resolution
Verification and Validation
Monitoring and control
The Estimating (EST) Practice Area has a close relationship with what other Practice Area:_____
Scheduling
Planning
Managing performance Measurement
Peer Reviews
Every CMMI practice requires its own process.
TRUE
FALSE
The intent of a Practice Area may be met by a single process or multiple processes depending on the needs of an organization's business
TRUE
FALSE
What Practice Area is about controlling and maintaining the integrity of work products?
Product integration
Change Management
Configuration Management
Verification and Validation
What Practice Area is about determining how much work will be required?
Estimating
Project Management
Planning
Goveranance
A single process must address all of the practices in a given Practice Area.
TRUE
FALSE
Level 4 practices use statistical and quantitative techniques to monitor and track actual results against measurement objectives
TRUE
FALSE
A list of action items from a meeting is an example of a work product for Risk and Opportunity Management (RSK) practice 2.1, which reads "Analyze identified risks or opportunities."
TRUE
FALSE
Which Practice Area contains the practice for determining performance improvement needs?
Process Management
Managing Performance and Measurement (MPM)
Process quality Assurance
Governance
Performance improvement needs can be determined from an analysis of organizational measurement and performance data.
TRUE
FALSE
Which Practice Area contains practices related to the following statement? "Our senior management team meets every quarter to review the status of our process improvement action plan, and to resolve any serious problems."
Governance
Management performance Measurement
Peer Reviews
Monitor and Control (MC)
Estimating size provides a consistent basis for estimating effort, duration, and cost
TRUE
FALSE