What is the role of a buyer within a construction company

a)

sources materials needed to complete a project by obtaining quotes from suppliers, with delivery times and quality assurance.

b)

is responsible for the pre-contract planning, as well as identifying the most economic and efficient way to use labour, plant and materials

c)

Making sure there is sufficient teas and coffees available on site

d)

The person who has to go to the merchants to purchase the materials required by operatives

2.

Who is responsible for the pre-contract planning, as well as identifying the most economic and efficient way to use labour, plant and materials

a)

The site manager

b)

The architect

c)

The planning engineer

d)

The estimator

3.

What does CDM stand for>

a)

Construction domestic manager

b)

Construction design manager

c)

Construction design management

d)

Construction development manager

4.

Building control officer (BCO) is employed by who

a)

The local authority

b)

The health and safety executive

c)

The architect

d)

The client

5.

A builder must notify the local authority building control officer a minimum of how many hours BEFORE work is programmed to commence

a)

24

b)

48

c)

36

d)

14

6.

Building control officers ensure that the building conforms to what, which answer is false

a)

Public health and safety

b)

Access for the disabled.

c)

Conservation

d)

HASAW act

7.

What building regulation covers ventilation

a)

G

b)

F

c)

L

d)

C

8.

What building regulations covers conservation of fuel and power in existing domestic buildings

a)

Part L1A

b)

Part L1B

c)

Part F1A

d)

Part L2A

9.

What is an approved document

a)

Manufacturers instructions

b)

Installation guides

c)

A site drawing

d)

Building regulations

10.

What does this symbol represent

a)

British standards Institution

b)

British safety Institute

c)

British standards Industry

d)

Gas safe register

11.

Building regulations part P says dangers zones are:

a)

Bathroom, lounge, Outhouse

b)

bathroom, kitchen, outhouse

c)

Bathroom kitchen, boat house

d)

Bathroom, Kitchen, Garage

12.

Building regulation L2b covers?

a)

Conservation of fuel and power in New dwellings

b)

Conservation of fuel and power in existing dwellings

c)

Conservation of fuel and power in New buildings other than dwellings

d)

Conservation of fuel and power in Existing buildings other than dwellings

13.

Who can sign a variation order

a)

Clerk of the works

b)

Site manager

c)

Plumbing supervisor

d)

Health and safety manager

14.

What is a Benchmark

a)

Benchmark is a nationally recognised scheme that places responsibility on both manufacturers and installers to ensure an installation is carried out at the right price

b)

Benchmark is a nationally recognised scheme that places responsibility on both manufacturers and installers to ensure an installation is carried out safely

c)

Benchmark is a nationally recognised scheme that places responsibility on both manufacturers and installers to ensure best practice in the installation

d)

Benchmark is a nationally recognised scheme that places responsibility on both manufacturers and installers to ensure an installation is carried out within a reasonable time

15.

What is the name of the document that allows additional works to be completed, which may fall outside the initial agreed contract. For example, if two extra radiators are requested by the client after the job commences

a)

Variety order

b)

Purchase order

c)

Bill of quantities

d)

Variation order