Worksheetsplanning and supervision plumbing L3
Total questions: 15
Worksheet time: 8mins
What is the role of a buyer within a construction company
sources materials needed to complete a project by obtaining quotes from suppliers, with delivery times and quality assurance.
is responsible for the pre-contract planning, as well as identifying the most economic and efficient way to use labour, plant and materials
Making sure there is sufficient teas and coffees available on site
The person who has to go to the merchants to purchase the materials required by operatives
Who is responsible for the pre-contract planning, as well as identifying the most economic and efficient way to use labour, plant and materials
The site manager
The architect
The planning engineer
The estimator
What does CDM stand for>
Construction domestic manager
Construction design manager
Construction design management
Construction development manager
Building control officer (BCO) is employed by who
The local authority
The health and safety executive
The architect
The client
A builder must notify the local authority building control officer a minimum of how many hours BEFORE work is programmed to commence
24
48
36
14
Building control officers ensure that the building conforms to what, which answer is false
Public health and safety
Access for the disabled.
Conservation
HASAW act
What building regulation covers ventilation
G
F
L
C
What building regulations covers conservation of fuel and power in existing domestic buildings
Part L1A
Part L1B
Part F1A
Part L2A
What is an approved document
Manufacturers instructions
Installation guides
A site drawing
Building regulations
What does this symbol represent
British standards Institution
British safety Institute
British standards Industry
Gas safe register
Building regulations part P says dangers zones are:
Bathroom, lounge, Outhouse
bathroom, kitchen, outhouse
Bathroom kitchen, boat house
Bathroom, Kitchen, Garage
Building regulation L2b covers?
Conservation of fuel and power in New dwellings
Conservation of fuel and power in existing dwellings
Conservation of fuel and power in New buildings other than dwellings
Conservation of fuel and power in Existing buildings other than dwellings
Who can sign a variation order
Clerk of the works
Site manager
Plumbing supervisor
Health and safety manager
What is a Benchmark
Benchmark is a nationally recognised scheme that places responsibility on both manufacturers and installers to ensure an installation is carried out at the right price
Benchmark is a nationally recognised scheme that places responsibility on both manufacturers and installers to ensure an installation is carried out safely
Benchmark is a nationally recognised scheme that places responsibility on both manufacturers and installers to ensure best practice in the installation
Benchmark is a nationally recognised scheme that places responsibility on both manufacturers and installers to ensure an installation is carried out within a reasonable time
What is the name of the document that allows additional works to be completed, which may fall outside the initial agreed contract. For example, if two extra radiators are requested by the client after the job commences
Variety order
Purchase order
Bill of quantities
Variation order