NEW
Font size
WorksheetsTEST 1
Total questions: 50
Worksheet time: 13hrs 30mins
Aframax, oil tankers between 75,000 and 115,000 DWT. This is the largest size defined by the annual freight rate assessment (AFRA) scheme.
TRUE
FALSE
VLCC (Very Large Crude Carrier), supertankers between 150,000 and 320,000 DWT
TRUE
FALSE
Cargo ships are categorized based on their capacity, weight and sizes
TRUE
FALSE
Vessel is ready in all respects for cargo operation and notice of readiness properly given is one of conditions in specified in the charterparty
TRUE
FALSE
Ex Works ( EXW) - A trade term requiring the seller to deliver goods to a named airport, terminal, or other place where the carrier operates
TRUE
FALSE
Compensation paid by shipowner to charterer as a 'reward' when the latter is able to complete the cargo operations in less time than the laytime allowed – Despatch
TRUE
FALSE
The space which can be utilised due to the type and nature of cargo loaded or structural interferences in the cargo hold – Broken Stowage
TRUE
FALSE
Gross tonnage, along with net tonnage, were defined by The International Convention on Tonnage Measurement of Ships, 1969, adopted by the International Maritime Organization in 1969, and came into force on July 8, 1982.
TRUE
FALSE
Lay days are specifying the earliest date on which laytime can commence and the latest date, after which the charterer, can opt to cancel the charterparty
TRUE
FALSE
Handymax, carriers of 40,000 - 50,000 GRT
TRUE
FALSE
Lightweight is the weight of a ship completes with outfit and propulsion machinery including fuel, fresh water, stores, provisions, passengers or cargo on board
TRUE
FALSE
NOR stand for Notice of readiness
TRUE
FALSE
Liner refer to cargo ship operating with regular runs or schedules, and limited to any particular cargo
TRUE
FALSE
Stowage Factor is a space which cannot be utilised due to the type and nature of cargo loaded or structural interferences in the cargo hold
TRUE
FALSE
GT and NT replaced gross register tonnage (GRT) and net register tonnage (NRT). It is a unitless index related to a ship's overall internal volume
TRUE
FALSE
Cargo batten is a long and narrow strip of wood used for various purposes
TRUE
FALSE
Demurrage is a Fee paid by the shipowner to the charterer when the latter's ship is detained beyond the specified date agreed in the charterparty
TRUE
FALSE
Function of cargo batten is keep cargo away from the ship's side
TRUE
FALSE
Keep a cargo in position in a ship's hold is main purpose of dunnage
TRUE
FALSE
Voyage charter – The charterer pays for the bunker fuel, fresh water, port charges etc
TRUE
FALSE
The criteria commencement of laydays shall be only when the following is satisfied;
I. When a vessel is arrived
II. Given NOR is accepted
III. Subject fully ready to load
IV. When port charges are paid
I, II and III
I, II and IV
II, III, and IV
All of the above
None of the above.
In order to make a maximum profit, the following matters are taken into account by Shipowner under voyage charter;
I. Port and agency costs
II. Stevedoring Expenses
III. Bunker Costs
IV. Ship Turn Around
I, II and III
I, II and IV
II, III, and IV
All of the above
None of the above.
Alongside means;
the goods are within reach of warehouse area
the goods are over the ship's rail
the goods are over the train's rail
the goods are within reach of a ship's lifting tackle
None of the above.
Which one is wrong?
Free pratique - Ship's Terminology
Feeder ship - Cargo Terminology
Delivered Ex Ship ( DES) - Trade Term
Deadfreight - Shipping term
None of the above.
Which one is wrong?
I. Voyage charter - A ship hiring contract for a single voyage from one or more named load port to one or more specified destination ports;
II. Time charter - A contract for the hire of a ship or charterparty for a specified period of time;
III. Time charter - the charterer pays for the bunker fuel, fresh water, port charges, etc. in addition to charter hire
IV. Bareboat charter - A type of charter in which the shipowner provides only the ship and gives the charterer complete control, management and operation of the vessel for an agreed leasing period; the charterer has to appoint the crew and pay all operating costs including stores and bunkers
I and III
II, III and IV
I, III, and IV
All of the above
None of the above.
Among the following are correct statement about Tramp Shipping, except;
I. Cargo ship operating without regular runs or schedules
II. Cargo ship calling same ports
III. Cargo ship operating with fixed schedule
IV. Normally use in container vessel
V. It is not limited to any particular cargo
I and III
II, III and IV
II, III, IV and V
All of the above
None of the above.
All of the following are land lord-port operator combinations that are right, with the exception of:
Port Kelang Authority-Northport
Rajang Port Authority-Bintulu Port
Kuantan Port Authority-Kuantan Port Consortium
Johore SEDC-Tanjung Langsat Port
Petronas-Kerteh Port.
One of the following is not a Malaysian shipowner or shipping line?
Pelorus Shipping
Global Carriers
Halim Mazmin
Johan shipping
Nutrajaya Shipping.
Which one is wrong regarding the figure above?
LR is stand for Lloyd's Register
WNA is Winter North Atlantic
Maximum draft for Summer is 11.7 m (estimation)
Load line mark positioned at amidships
The figure describe INCOTERM under;
Freight Collect Term
Freight Prepaid Term
Freight Rate Term
Cost and Freight Term
Which one is wrong?
Bagged Cargo - Conveyor Belt
Dry Bulk Cargo - Grab
Liquid Bulk Cargo - Ship Manifold
General Cargo - Lifting Gear
Container - Straddle Carrier
RORO Ship
Multi-Purpose Ship
Heavy Lift Ship
PCTC Ship
Equipment above are suitable for;
Bulk solid cargoes
General cargoes
Specialist cargoes
Container cargoes
Heavy lift cargoes
