NEW
Font size
WorksheetsHighway and Transportation Eng'g
Total questions: 15
Worksheet time: 7mins
What office is responsible for zoning of their respective jurisdictions and final land use and zoning planes to be submitted to HLURB (Housing and Land Use Regulatory Board) for approval?
Provincial Planning Development Office (PPDO)
City Planning Development Office (CPDO)
Municipal Planning and Development Office (MPDO)
All of the above
Ideal Capacity of a road is:
1800 vehicles/hr
2000 vehicles/hr
1400 vehicles/hr
1200 vehicles/hr
The required length of the turnout shall be determined considering a length of _____ meters for each bus.
16.0
15.5
15.0
14.5
The length of superelevation development from the normal cross slope to the zro cross slope point on the tangent is known as:
tangent runoff
tangent runout
super elevation runout
super elevation runoff
Criteria used for the establishment of sag vertical curves:
I. Headlight sight distance
II. Passenger comfort
III. Drainage control
IV. General appearance
V. Velocity of cars passing thru the curve
I, II, IV and V only
I, II, III and IV only
II, IV and V only
All of the above
They are essential part of any road that is not on fill and must be incorporated into the road cross-section. These are designed to accommodate the expected rainfall but can often be hazardous to vehicles that run off the road.
transverse drainage ditches
shoulder
drop curve and gutters
longitudinal drainage ditches
The most important criteria to consider to avoid safety hazards created by the drainage ditches is the actual reconnaissance survey during wet whether to identify the natural run-out locations. Slopes on the side nearest the road should not be steeper than _____ and preferable flatter as this will minimize accident severity. The slope farthest from the road may be as steep as the ground will permit.
4:1
3:1
2:1
1.5:1
What are the components in stopping sight distance?
I. Reaction distance
II. Braking distance
III. Height of driver’s eye above the roadway
IV. Height of object
I, II and IV only
I, II and III only
I and II only
All of the above
The speed limit appropriate on a high standard duplicated carriageway road where there is only occasional access from adjoining properties is:
50 kph
30 kph
60 kph
80 kph
It is the maximum number of vehicles, which have a reasonable expectation of passing over a given section of a lane or a roadway in one direction or in both directions during one hour under prevailing road and traffic conditions.
Density
Free Flow
Road Capacity
Flow of Traffic
The specific location of turnouts shall be determined taking into consideration the following conditions:
I. Turnout shall be placed at locations/poblacions where pedestrians are normally concentrated.
II. A turnout may be placed at least 50 meters after a road intersection.
III. Minimum distance between two consecutive turnouts in one direction shall not be less than 500 meters in cities/urban centers. In other areas, the minimum distance shall not be less than 1 kilometer.
IV. Turnouts should be placed on or adjacent to horizontal and vertical curves that limits the sight distances in either direction.
I, II and IV only
I, III and IV
I, II and III only
All of the above
The following are vulnerable road users:
I. Pedestrians
II. People with disabilities
III. Non-motorized vehicles
IV. Motorcycles
V. Dilapidated vehicles
I, II, III and IV only
I, III and IV only
I, III, IV and V only
All of the above
Vehicles parked near intersections can obstruct the flow of turning traffic. Thus, parking should be prohibited within the following minimum distances from the boundaries of intersecting roads for parallel parking - _____ meters on both approach and exit sides.
6
10
12
8
Vehicles parked near intersections can obstruct the flow of turning traffic. Thus, parking should be prohibited within the following minimum distance from the boundaries of intersecting roads for angle parking - ______ meters on both approach and exit sides.
6
10
12
8
A special form of overtaking lane but they are only provided on inclines where truck speed fall to 40 kph or less and upgrade traffic flow rate in excess of 20 vehicles per hour.
climbing lanes
tapered lanes
ramps
diverging lanes