Which of the following is the best cause of action if you come across a faulty piece of machinery?
leave it and find a similar machine to do the job you need
keep working and let someone else deal with it
turn it off and report it to the teacher
none of the above
Based on the data shown, which answer is correct?
construction workers are less likely to be injured on the job
construction workers are more likely to be injured on the job
injuries are increasing in the workplace
there has been no change in the frequency of workplace injuries
Note the plan of a stud wall frame. The total linear meterage of timber required is ….
(to change from mm to m > divide total by 1000)
3.095m
3.435m
3.95m
3.345m
Given the price of timber is $4.15/LM, which answer gives the correct calculation of material cost for the stud wall shown?
$13.90
$12.85
$16.40
$7.50
A sheet of gyprock plasterboard is 2400mm long and 1200 mm wide. How many pieces could be cut from it to fully cover the framework shown?
4
6
8
7
You are required to order material for a job based upon the table shown. What dimensions of timber should you order for the top plate only?
70 x 35
70 x 38
270 x 45
70 x 45
What is the separation from one to stud to the next when measured from their centres or mid-line?
900
600
450
70
In the image shown a trades person is fixing a sheet of ply to the corner of a frame. This sheet of ply is .....
to brace framework against lateral (sideways) movement
is going to be cut out later for as door to fit
protecting the framework against the weather
where the trades person ran out of material to complete the framework
When marking out the position of your studs on the top and bottom plate what is the best coarse of action so that you do not get confused where the stud is to be fixed?
nothing, as it is easy to remember
place a (X) on the correct side of the mark
fix the stud in place as soon as it is measured
temporarily screw the stud in place
The most probable cause of the fault shown is .......
the bricks weren't the correct type
the lintel used was too heavy
there is no casing in the opening to help support the brickwork
the size of the lintel used was inadequate