1.

1. Which of the following is a non-renewable resource?

a)

coal

b)

Forests

c)

Water

d)

Wildlife

2.

The primary source of the energy are

a)

coal,oil & Uranium

b)

hydrogen, oxygen and water

c)

wind, biomass and geothermal

d)

none of the above

3.

India first nuclear power plant was installed at

a)

Tarapore

b)

Kota

c)

Kalpakkam

d)

None

4.

Load factor during a period is

a)

Average Load / Installed Capacity

b)

Average Load / Maximum Load

c)

Maximum Load / Average Load

d)

Maximum Load / Installed Capacity

5.

The unvarying load, which occurs almost the whole day on the power plant is called

a)

Base load

b)

Peak load

c)

Average load

d)

Discrete load

6.

he system supplying base and peak loads will be more economical if power is supplied by

a)

Only gas turbine power plant

b)

Only thermal power plant

c)

Only Diesel power plant

d)

Combined operation of various power plants

7.

Which of the following is an essential requirement for a peak load plant

a)

Capability of working continuously

b)

Low operating cost

c)

Capability of quick start

d)

Economical and speedy repair

8.

Which of the following is not suitable to uses as peak plant?

a)

Hydroelectric power plant

b)

Gas power plant

c)

Diesel elected plant

d)

Nuclear power plant

9.

Annual depreciation cost calculated by

a)

(a) sinking fund method

b)

(b) straight method

c)

(c) Both a & b

d)

(d) estimates values

10.

In India the tariff for charging the consumers or the consumption of electricity is based on

a)

straight meter rate

b)

block meter rate

c)

reverse form of block meter rate

d)

two part tariff

11.

Annual depreciation as per straight line method, is calculated by

a)

The capital cost divided by number of years of life

b)

The capital cost minus the salvage value, is divided by the number Years of life

c)

Investing a uniform sum of money per annum at stipulated rate of interest.

d)

None

12.

What type of cross sections does wind turbine blades have?

a)

Penta hedral cross section

b)

Air foiled type cross section

c)

Radar cross section

d)

Turbo cross section

13.

What does WECS stands for?

a)

Wind energy conversion system

b)

Wind engine control system

c)

Wind energy combined system

d)

Wind engine comparison system

14.

The turbine which is used in tidal power plant for getting continues power is

a)

simple impulse type

b)

reversible type

c)

propeller type

d)

None

15.

Most widely used material of solar cell is

a)

arsenic

b)

cadmium

c)

silicon

d)

steel

16.

The main objective of energy management is to

a)

Minimize energy cost

b)

Minimum environmental effects

c)

Maintain optimum energy procurement and utilization

d)

All of these

17.

The capital cost of generating equipment, transmission system and distribution system comes under

a)

Fixed capital

b)

Running capital

c)

Both fixed and running capital

d)

None

18.

The Function of solar collectors to convert

a)

Solar energy into electricity

b)

Solar energy into radiations

c)

Solar energy into thermal energy

d)

None

19.

Flat plat collector absorbs

a)

Directly radiation only

b)

Diffuse radiation only

c)

Direct and Diffuse both

d)

None

20.

Turbines with how many propellers are used in order to avoid vibrations?

a)

1

b)

2

c)

3

d)

4