1.

WARMING up : How many operating mode(s) in MEDP ?

a)

One - SW only

b)

One - RW only

c)

Two - SW and RW mode

d)

One - Chinling's mood =,='''

2.

Plant start up : During intake dump, intake pump and intake dump valve FCV1400-01 is operated at ?

a)

pump at fix speed, intake dump valve at PRESSURE control

b)

Pump at fix speed, valve at fix position

c)

Pump at FLOW control, valve at fix position

3.

Plant start up : What determine completion of intake dumping step ?

a)

it stops by itself

b)

Timer

c)

Turbidity check in plant

d)

Conductivity check in plant

4.

Plant Start Up : What is the overall sequence of dumping ?

a)

Intake dump > UF Feed Dump > RO Feed Dump > UV dump

b)

Intake dump > DAF Trains Dump > RO Feed Dump

c)

Intake Dump > RO Feed Dump > UV Dump

5.

Plant Start up : UF Feed dump - what determines the completion ( end step )?

a)

Timer for quality check

b)

Turbidity of DAF running Trains

c)

Conductivity at outfall

d)

all above

6.

Plant Start Up : What is the UF Feed Pump control sequence before RO train start up

a)

1 , 2 , 3, 4

b)

2 , 1 , 4, 3

c)

1, 2, 4, 3

7.

PLANT Start up : Before starting up UF trains,

a)

UF Filtrate header is pressurized

b)

Open analyzer isolation valve at RO trains

c)

SDI is checked at UF Feed

8.

Intake : Chinling's oil tanker spill at Intake. Oil and Grease >10ppm.

a)

Run plant as usual

b)

Notify PUB, Plant needs to shutdown as its higher than design threshold limit

9.

Intake : When shock chlorination to intake screen is carried out ?

a)

Reservoir water mode

b)

Seawater Mode

c)

Any mode

10.

Intake : Why shock chlorination to intake screen is required during SW mode ?

a)

SW is smelly

b)

to prevent marine creatures growth

c)

To scare fishes away intake screen

11.

Intake : Intake screen is cleaned by ?

a)

Backwash

b)

CEB

c)

CIP

d)

Air Blast

12.

Intake : Intake screen size ?

a)

20 mm

b)

5 mm

c)

10mm

d)

0.04mm

13.

Intake : during plant in RUNNING, intake pumps are controlled by ?

a)

A. Pressure control at discharge header

b)

B. Flow control to meet UF feed flow

c)

C. DAF Effluent Wet Well level trim

d)

B and C

14.

DAF : What quality required for DAF outlet ?

a)

pH > 8

b)

Turbidity <= 5 NTU

c)

Conductivity >20,000uS/cm

d)

There is no monitoring on quality

15.

DAF: What is the target pressure for air saturator (recycling pump discharge pressure) ?

a)

2 bar

b)

4 bar

c)

6 bar

d)

no requirement

16.

DAF Inlet: What chemicals are dosed ?

a)

FeCl3

b)

H2SO4

c)

Polymer

d)

All above

17.

DAF : Why FeCl3 is dosed at DAF inlet ?

a)

Color looks nice =)

b)

To decrease pH

c)

As Coagulant to coagulate particles

18.

DAF : In lab, what test to carry out to estimate chemical dosage (Acid, FeCl3, polymer) required for DAF?

a)

SDI

b)

Jar Test

c)

All above

d)

None of them

19.

DAF : What does the DAF Train outlet FCV valve control ?

a)

Pressure of recycling pump discharge

b)

Level of DAF Effluent Wet Well

c)

Level in respective DAF Trains

20.

DAF : SW mode - To meet pH 7, the more FeCl3 ppm is dosed,

a)

The more H2SO4 dosage (ppm) required

b)

No change in H2SO4 dosage (ppm)

c)

The lesser H2SO4 dosage (ppm) required

21.

Strainers : What is strainers size ?

a)

200 microns (um)

b)

50 microns (um)

c)

100 microns (um)

d)

5 microns (um)

22.

Strainers : What BW flow is required ?

a)

550 m3/hr

b)

650m3/hr

c)

850m3/hr

d)

I never notice when i run the plant

23.

Strainers : What triggers Strainer Backwash ?

a)

Timer

b)

Filtration volume

c)

either one, whichever come first

d)

None of them

24.

Strainers : How many sources to top up Strainer backwash tank ?

a)

1

b)

2

c)

3

d)

4

25.

Strainers : SW mode - which source used to top up Strainer BW tank ?

a)

A. Strainer filtrate (during plant startp/shutdown)

b)

B. SWRO (RO 1st Pass) Brine

c)

C. BWRO (RO 2nd Pass) Brine

d)

A and B

26.

Strainers : SW mode - why RO 1st Pass Brine is be used for Strainer BW ?

a)

Good quality (Turbidity)

b)

Good quality (pH)

c)

Good quality (Conductivity)

d)

Good quality (ORP)

27.

Strainers : SW mode - why RO 2nd Pass Brine is NOT used for BW ?

a)

To lousy quality. It's discharged to outfall

b)

Too good quality. It's recycled to UF filtrate header.

c)

I wish to know

28.

Strainers : RW mode - which source used to top up Strainer BW tank ?

a)

A. Strainer filtrate (during plant startp/shutdown)

b)

B. SWRO (RO 1st Pass) Brine

c)

C. BWRO (RO 2nd Pass) Brine

d)

A and C

29.

UF : If SDI needs to be carried out at UF Feed, which shall be used ?

a)

SDI 15 mins

b)

SDI 5 mins or 10 mins

30.

UF : Which is used to check UF Filtrate SDI ?

a)

SDI 15 mins

b)

SDI 5 mins or 10 mins

31.

UF : What is quality required for UF Filtrate (no UF membrane breakage) ?

a)

SDI ≤ 3

b)

Turbidity ≤ 0.1 NTU (95%)

c)

Both

32.

UF : What is UF membrane pore size ?

a)

10 microns (um)

b)

1 microns (um)

c)

0.02 micron nominal, 0.05 micron max.

d)

5 microns (um)

33.

UF : What is UF CIP filter size ?

a)

10 microns (um)

b)

1 microns (um)

c)

0.04 microns (um)

d)

20 microns (um)

34.

UF : What decide number of UF Trains required ?

a)

UF Filtrate Header pressure

b)

Switch Flux

c)

It's fixed for SW and RW mode

35.

UF : UF Train filtration step is ended by ?

a)

A. Filtration duration of 2 hours

b)

B. Filtration volume

c)

A and B, whichever come first

d)

None of them

36.

UF Backwash : What is the flux required?

a)

240 lmh

b)

120 lmh

c)

Doesn't matter

37.

UF Backwash : Why BW pump is in re-circulation between UF trains entering backwash ?

a)

to minimize start and stop of BW pump

b)

to keep BW tank level

c)

To keep pressure at BW pump discharge

38.

UF : CEB 1 has 1A and 1B. What they are?

a)

1A is low pH, 1B is high pH

b)

1A is high pH , 1B is low pH

39.

UF : CEB 1A is high pH to remove organic foulant. Which chemical(s) is used ?

a)

NaOCl and NaOH

b)

H2SO4 only

c)

NaOCl and H2SO4

d)

H2SO4 and FeCl3

40.

UF : CEB 1A - during chemical rinsing step, what is dosed at UF Concentrate line (to EQ tank) and its purpose ?

a)

H2SO4 - to decrease pH

b)

SBS - to remove chlorine

c)

NaOH to increase pH

d)

No chemical is dosed

41.

UF CEB : 1B is low pH to remove inorganic foulant. Which chemical is used ?

a)

NaOCl and NaOH

b)

H2SO4 only

c)

NaOCl and H2SO4

d)

NaOCl and H2SO4