Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Electric Industry Literacy Overview

Total questions: 11

Worksheet time: 6mins

Name
Class
Date
1.

Which electric equipment is represented by letter C?

a)

Electric meter panel

b)

Underground service cable

c)

Residential pad-mounted transformer

d)

Meter Can

2.

Which pieces of the above ground electric system are customers responsible for? Check all that apply.

a)

Secondary wire

b)

Weatherhead

c)

Service drop

d)

Meter can

3.

Which pieces of the underground electric system are customers responsible for? Check all that apply.

a)

Primary cable

b)

Pad-mounted transformer

c)

Underground service cable

d)

Meter can

4.

When was the electric industry deregulated in Texas?

a)

2001

b)

2002

c)

2003

d)

2004

5.

The electric industry in Texas is deregulated. This means customers have the option to choose their retail provider. True/False

a)

True

b)

False

6.

What is the measurement of energy used over a given period of time?

a)

kilowatt hours

b)

kili-minutes

c)

therms

d)

cubic volts

7.

What is used to develop a network of transmission lines, equipment, controls and technologies working together to respond immediately to electricity demand?

a)

Educated grid

b)

Smart grid

c)

Super grid

d)

Quick grid

8.

What letter do AMS Meter numbers start with?

a)

A

b)

F

c)

I

d)

R

9.

CenterPoint Energy operates as a Transmission and Distribution Service Provider in Houston and the surrounding areas.

a)

True

b)

False

10.

A Guy Wire can become energized when it ?

a)

Makes contact with an ant.

b)

Makes contact with a meter

c)

Makes contact with an energized line

d)

Makes contact with a baseball

11.

CenterPoint Energy's tag line is

(a)