Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

SE Quiz 1 (FG)

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Which one of the following characteristics of software products being developed is not a symptom of software crisis?

a)

Fail to meet user requirements.

b)

Expensive.

c)

Highly interactive

d)

Difficult to alter, debug, and enhance.

2.

The operation phase of the waterfall model is a synonym for which one of the following phases?

a)

Coding and unit testing phase

b)

Integration and system testing phase

c)

Maintenance phase

d)

Design phase

3.

Unit testing is carried out during which phase of the waterfall model?

a)

Implementation phase

b)

Testing phase

c)

Maintenance phase

d)

Design phase

4.

Agile model advocates which one of the following approaches?

a)

In each increment, get something “quick and dirty” delivered and thereby save time

b)

In each increment, get something simple released as quickly as possible

c)

In each increment, get something of business-value delivered as quickly as possible, consistent with the right level of quality

d)

In each increment, get something delivered once it has been fully documented and the documentation has been signed off as complete

5.

A software requirements specification (SRS) document should avoid discussing which one of the following?

a)

Functional requirements

b)

Non-functional requirements

c)

Design specification

d)

Constraints on the implementation

6.

Milestones are used to

a)

Know the cost of the project

b)

Know the status of the project

c)

Know user expectations

d)

Know funding agencies

7.

Software engineering approach is used to achieve:

a)

Better performance of hardware

b)

Error free software

c)

Reusable software

d)

Quality software product

8.

Statistically, the maximum percentage of errors belong to the following phase of SDLC

a)

Coding

b)

Design

c)

Requirement Specifications

d)

Installation and maintenance

9.

Level-O DFD is similar to

a)

Use case diagram

b)

Context diagram

c)

System diagram

d)

Stae chart diagram

10.

Function point can be calculated by

a)

UFP * CAF

b)

UFP * EAF

c)

UFP * Cost

d)

UFP * Productivity