wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

DESIGN AND BUILDING TEAM

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

UNDER A PROJECT TEAM, WHO IS THE PARTY UNDER CONTRACTOR.

a)

SUB-CONTRACTORS AND CONSULTANT

b)

SUB-CONTRACTORS AND SUPPLIER

c)

SUB-CONTRACTORS AND DESIGNER

d)

SUB-CONTRACTORS AND MANAGER

2.

INTEGRATED PROJECT TEAM CONSISTS OF

a)

CLIENT TEAM AND SUPPLY TEAM

b)

CLIENT TEAM AND CONTRACTOR TEAM

c)

CLIENT TEAM AND CONSULTANT TEAM

d)

CLIENT TEAM AND ADMINISTRATIVE TEAM

3.

WHAT IS THE DESIGN TEAM CONSISTS?

a)

ARCHITECTS AND CONTRACTOR

b)

ARCHITECTS AND PROJECT MANAGER

c)

ARCHITECTS AND ENGINEER

d)

ARCHITECTS AND DEVELOPER

4.

WHAT IS THE BIGGEST CHALLENGE OFTEN FACING IN DESIGN PROCESS?

a)

FINANCIAL CONSTRAINT

b)

LACK OF TOOLS AND EQUIPMENT

c)

LIMITED TIME PERIOD

d)

COMMUNICATION BREAKDOWN

5.

WHAT IS BUILDING INFORMATION MODELLING (BIM)

a)

MODELLING AND DESIGN SOFTWARE THAT INTEGRATES THE DESIGN, ENGINEERING AND PROJECT MANAGEMENT ROLES

b)

MODELLING AND MANAGEMENT SOFTWARE THAT INTEGRATES THE DESIGN, ENGINEERING AND PROJECT MANAGEMENT ROLES

c)

MODELLING AND COSTING SOFTWARE THAT INTEGRATES THE DESIGN, ENGINEERING AND PROJECT MANAGEMENT ROLES

d)

MODELLING AND TIME MANAGEMENT SOFTWARE THAT INTEGRATES THE DESIGN, ENGINEERING AND POJECT MANAGEMENT ROLES

6.

WHAT IS THE ROLES OF PROJECT MANAGER DURING THE DESIGN PROCESS?

a)

FACILITATE THE MODE OF PAYMENT BETWEEN OTHER ENTITIES INVOLVED IN THE PROCESS

b)

FACILITATE THE TOOLS AND EQUIPMENT BETWEEN OTHER ENTITIES INVOLVED IN THE PROCESS

c)

FACILITATE THE FLOW OF INFORMATION BETWEEN OTHER ENTITIES INVOLVED IN THE PROCESS

d)

FACILITATE THE WORK SCHEDULE ON SITE BETWEEN OTHER ENTITIES INVOLVED IN THE PROCESS

7.

TYPICALLY, THE CONSTRUCTION TEAM WILL COMPRISE THE FOLLOWING ROLES THAT WILL BE MOSTLY SITE BASED

a)

PROJECT MANAGER, MAIN CONTRACTOR, DEVELOPER, SUB-CON

b)

PROJECT MANAGER, INTERIOR DESIGNER, SITE ENGINEER, SUB-CON

c)

PROJECT MANAGER, CLIENT, COW, SITE ENGINEER, SUB-CON

d)

PROJECT MANAGER, MAIN CONTRACTOR, COW, SITE ENGINEER, SUB-CON

8.

WHAT IS THE PM STAND FOR IN CONSTRUCTION PROJECT

a)

PROJECT MANAGER

b)

PROJECT MANIPULATOR

c)

PROJECT MAKER

d)

PROJECT MENTOR

9.

THE PRIMARY CONSTRAINT OF PROJECT MANAGEMENT, EXCEPT

a)

DURATION

b)

QUALITY

c)

SOFTWARE

d)

COST

10.

FOLLOWINGS IS THE TYPE OF LEADERSHIP EXCEPT

a)

DEMOCRATIC

b)

AUTOCRATIC

c)

AUTOMATIC

d)

LAISSEZ-FAIRE