1.

The placing of new Foundation below and existing foundation of the process of strengthening the existing Foundation is known as the ___________ of foundation.

a)

Shoring

b)

Underpinning

c)

Grouting

d)

Scaffolding

2.

In _____ method of underpinning, the existing wall is divided into suitable sections of width about 1.20 metre to 1.50 metre.

a)

Chemical Method

b)

Pile Method

c)

Miscellaneous Method

d)

Pit Method

3.

In ____ method, the piles are driven along both the sides of existing wall and the needle in the form of pile caps are provided through the existing one.

a)

Miscellaneous method

b)

Vibroflotation

c)

Pit method

d)

Pile method

4.

When one building is higher than the other, _________ may be provided on the horizontal shores.

a)

Pit Underpinning

b)

Flying shore

c)

Pile Underpinning

d)

Raking shore

5.

A large factor of safety should be adopted in the design of _____ as it is difficult to assess the actual loads.

a)

Pile method

b)

Horizontal shore

c)

Pit method

d)

Vertical shores

6.

The following is not a classification of maintenance

a)

Preventive maintenance

b)

Scheduled maintenance

c)

Timely maintenance

d)

Corrective maintenance

7.

Belt of an electric motor is broken, it needs

a)

Corrective maintenance

b)

Scheduled maintenance

c)

Preventive maintenance

d)

Timely maintenance

8.

A systematic approach for maintenance is

a)

Problem – Cause – Diagnosis – Rectification

b)

Problem– Diagnosis – Cause – Rectification

c)

Problem – Measure – Diagnosis – Rectification

d)

Problem– Diagnosis – Measure – Rectification

9.

With the increase in preventive maintenance cost, breakdown maintenance cost

a)

Increases

b)

Decreases

c)

Remain same

d)

Any of the above

10.

Scheduled maintenance is _______ between breakdown maintenance and the preventive maintenance.

a)

Joint

b)

Compromise

c)

Bridge

d)

In

11.

The following is (are) scheduled maintenance

a)

Overhauling of machine

b)

Cleaning of tank

c)

Whitewashing of building

d)

All of the above

12.

underpinning is the process of strengthening and stabilizing the foundation of an existing building or other structure.

a)

True

b)

False

13.

The following are the ways of achieving underpinning except

a)

soil treatment

b)

Piling

c)

Load transfer and soil treatment

d)

Load transfer

14.

The following are advantages of mass concrete underpinning except

a)

Speed in execution of work

b)

Simplicity of engineering work

c)

Continuous use of building whiles undertaking the work

d)

Low cost of labor

15.

Which of these types of maintenance is a reactive type of maintenance?

a)

Routine maintenance

b)

Scheduled maintenance

c)

Corrective maintenance

d)

Condition-based maintenance

16.

Preventive maintenance is carried out to avoid breakdown/defects in buildings and services.

a)

True

b)

False

17.

The combination of technical and administrative actions to ensure the items and elements of a building in an acceptable standard to perform its required function is known as

a)

Fabrication

b)

Construction

c)

Building maintenance

d)

Renovation

18.

It occurs when an asset requires immediate attention in order to keep a facility operational or safe. What type of maintenance is this?

a)

Planned maintenance

b)

Corrective maintenance

c)

Running maintenance

d)

Emergency maintenance

19.

Beam design is dependent upon the configuration of the building and the applied loads.

a)

True

b)

False

c)

None of the above

20.

Mini-piled underpinning is generally used when the loads from the foundations need to be transferred to stable soils at considerable depths - usually in excess of 5 meters

a)

True

b)

False

c)

None of the above

21.

Identify the figure

a)

Jacked pile underpinning

b)

Mini-piled Underpinning

c)

Beam and base underpinning

d)

None of the above

22.

This underpinning method strengthens an existing structure's foundation by digging boxes by hand underneath and sequentially pouring concrete in a

strategic order. What type of underpinning is this?

a)

Beam and base underpinning

b)

Traditional underpinning

c)

Pile underpinning

d)

Micro-pile underpinning

23.

Identify the figure

a)

Traditional underpinning

b)

Mass concrete underpinning

c)

Beam and base underpinning

d)

None of the above

24.

Which of the following is a disadvantage of the pit method of underpinning?

a)

Simplicity of the engineering

b)

Having moderate deformation of the structure

c)

Low cost of labor to produce result

d)

None of the above

25.

Which figure describes the traditional underpinning?

a)
b)
c)
d)