Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

This method of compensation for architectural services is the most common worldwide.

a)

Percentage based on Project Construction Cost

b)

Multiple of Direct Personnel Expense

c)

Unit Cost Method

d)

Value-based Pricing

2.

The remuneration under this method is based on cost per square meter of the project such as room, store, buildings or other unit.

a)

Unit Cost Method

b)

Value-based Pricing

c)

Percentage based on Project Construction Cost

d)

Lump Sum or Fixed Fee

3.

The remuneration under this method is based on the outcome of revenue, cost and profitability result of a project engagement or based on a measurable profit on specific revenues by the Client.

a)

Value-based Pricing

b)

Unit Cost Method

c)

Lump Sum or Fixed Fee

d)

Time basis

4.

are fees which are charged on an agreed-to hourly (man-hours) or daily (per diem) or per month rate.

a)

Time-based fees

b)

Lump Sum or Fixed Fee

c)

Percentage of Gross Rentals

d)

Unit Cost Method

5.

lt establishes an agreed fixed rate or lump sum over and

above the reimbursement for the Architect's technical time

and overhead.

a)

Professional Fee Plus Expenses

b)

Per Diem, Honorarium plus Reimbursable Expenses

c)

Per Diem or Hourly Basis

d)

Salary cost times a multiplier, plus direct cost or reimbursable expenses

6.

This method is particularly suited to engagements

involving intermittent personal service.

a)

Per Diem or Hourly Basis

b)

Professional Fee Plus Expense

c)

Lump Sum or Fixed Fee

d)

Time basis

7.

Manner of Providing Services under PRE-DESIGN SERVICES (SPP Doc. 201) are as follows EXCEPT:

a)

Scope of Work

b)

Manner of Payment

c)

Owner's Responsibilities

d)

Other Methods of Compensation

8.

The following buildings are of the simplest utilization and character EXCEPT;

a)

lndustrial Buildings

b)

Industrial Plants

c)

Parking Structures

d)

Publishing Plants

9.

Buildings under Group 2 or of moderate complexity of plan/design

a)

Correctional & Detention Facilities

b)

Laboratories / Testing Facilities

c)

Hospitals & Medical Buildings

d)

Public Health Centers

10.

GROUP 3 Buildings EXCEPT;

a)

Aquariums

b)

Auditoriums

c)

Theaters & Similar Facilities

d)

Exposition & Fair Buildings

11.

Theses Buildings are under GROUP 4 but not;

a)

Shop-houses

b)

Duplex

c)

Townhouses

d)

Multi-storey Apartments

12.

The following are Monumental buildings and other facilities requiring consummate design skill and much precise detailing excluding;

a)

Memorials

b)

Museums

c)

Specialized decorative buildings

d)

Mortuaries

13.

When the plan/design and related Contract Documents are re-used for the repetitive construction of similar buildings without amending the drawing and the specifications.

a)

Group 6

b)

Group 7

c)

Group 4

d)

Group 8

14.

Recommended Professional Fee (RPF) for DAEDS under Group 7 with Thirty-one units to fifty units (31-50)

a)

Fee for 30 units plus 25% of RPF for each additional unit

b)

Fee for 30 units plus 30% of RPF for each additional unit

c)

Fee for 30 units plus 20% of RPF for each additional unit

d)

Fee for 30 units plus 15% of RPF for each additional unit

15.

Recommended Professional Fee for Projects involving extensive detail such as designs for built-in components or elements, built-in equipment, special fittings, screens, counters, architectural interiors, and development planning and/or design.

a)

15% of the PCC

b)

12% of the PCC

c)

10% of the PCC

d)

7.5% of the PCC

16.

Where the Architect is engaged to render opinion or give advice, clarifications or explanation on technical matters pertaining to his profession the chargeable RPF shall not

be less than;

a)

P1,000.00 / hr

b)

P5,000.00 / hr

c)

P1,500.00 / hr

d)

P3,000.00 / hr

17.

Upon signing of the Service Agreement an amount equivalent to ____ of the agreed Professional Fee shall be paid by the Owner as engagement fee or as the acceptance fee of the Architect that shall cover the mobilization component of the services.

a)

5%

b)

10%

c)

15%

d)

20%

18.

How many percentage of the Professional Fee allotted for the Periodic Construction Supervision (PCS)?

a)

Five (5%)

b)

Ten (10%)

c)

Fifteen (15%)

d)

Three (3%)

19.

For this type of services, the term Architect refers to the Consulting Architect (CA) who may be the holder of a valid Specialist Certificate that may be issued by the Board and/or the Commission, upon due qualification or accreditation by the lAPoA.

a)

SPECIALIZED ARCHITECTURAL SERVICES

b)

FULL-TIME SUPERVISION SERVICES

c)

POST-CONSTRUCTION SERVICES

d)

COMPREHENSIVE ARCHITECTURAL SERVICES

20.

Upon submission of the preliminary design, the Recommended Professional Fee under SPECIALIZED ARCHITECTURAL SERVICES (SPP Doc. 203) shall be;

a)

30% of the fee

b)

50% of the fee

c)

20% of the fee

d)

15% of the fee

21.

The Recommended Professional Fee (RPF) per hectare for the first five (5 has.) hectares net to the architect.

a)

P50,000.00

b)

P150,000.00

c)

P25,000.00

d)

P100,000.00

22.

The Recommended Professional Fee (RPF) for Fulltime Construction Supervision Services

a)

1-1.5% of PCC

b)

2-3% of PCC

c)

1.5-2% of PCC

d)

3-5% of PCC

23.

The Owner will pay the Construction Manager a fixed

fee plus reimbursement of certain expenses incurred in the performance of basis services.

a)

Cost Plus Fixed Fee

b)

Cost plus Incentive Fee

c)

Fixed Price Incentive

d)

Firm Fixed Price

24.

The services of the Architect as Construction Manager can be compensated by a Recommended Professional Fee (RPF) of?

a)

1.5 - 3% of PCC

b)

1.5 - 2.5% of PCC

c)

2 - 3% of PCC

d)

3 - 5% of PCC

25.

The Recommended Professional Fee (RPF) based on value-pricing is from _____ of gross rental

a)

4% to 6%

b)

2% to 5%

c)

5% to 10%

d)

1% to 3%