Total questions: 25
Worksheet time: 13mins
This method of compensation for architectural services is the most common worldwide.
Percentage based on Project Construction Cost
Multiple of Direct Personnel Expense
Unit Cost Method
Value-based Pricing
The remuneration under this method is based on cost per square meter of the project such as room, store, buildings or other unit.
Unit Cost Method
Value-based Pricing
Percentage based on Project Construction Cost
Lump Sum or Fixed Fee
The remuneration under this method is based on the outcome of revenue, cost and profitability result of a project engagement or based on a measurable profit on specific revenues by the Client.
Value-based Pricing
Unit Cost Method
Lump Sum or Fixed Fee
Time basis
are fees which are charged on an agreed-to hourly (man-hours) or daily (per diem) or per month rate.
Time-based fees
Lump Sum or Fixed Fee
Percentage of Gross Rentals
Unit Cost Method
lt establishes an agreed fixed rate or lump sum over and
above the reimbursement for the Architect's technical time
and overhead.
Professional Fee Plus Expenses
Per Diem, Honorarium plus Reimbursable Expenses
Per Diem or Hourly Basis
Salary cost times a multiplier, plus direct cost or reimbursable expenses
This method is particularly suited to engagements
involving intermittent personal service.
Per Diem or Hourly Basis
Professional Fee Plus Expense
Lump Sum or Fixed Fee
Time basis
Manner of Providing Services under PRE-DESIGN SERVICES (SPP Doc. 201) are as follows EXCEPT:
Scope of Work
Manner of Payment
Owner's Responsibilities
Other Methods of Compensation
The following buildings are of the simplest utilization and character EXCEPT;
lndustrial Buildings
Industrial Plants
Parking Structures
Publishing Plants
Buildings under Group 2 or of moderate complexity of plan/design
Correctional & Detention Facilities
Laboratories / Testing Facilities
Hospitals & Medical Buildings
Public Health Centers
GROUP 3 Buildings EXCEPT;
Aquariums
Auditoriums
Theaters & Similar Facilities
Exposition & Fair Buildings
Theses Buildings are under GROUP 4 but not;
Shop-houses
Duplex
Townhouses
Multi-storey Apartments
The following are Monumental buildings and other facilities requiring consummate design skill and much precise detailing excluding;
Memorials
Museums
Specialized decorative buildings
Mortuaries
When the plan/design and related Contract Documents are re-used for the repetitive construction of similar buildings without amending the drawing and the specifications.
Group 6
Group 7
Group 4
Group 8
Recommended Professional Fee (RPF) for DAEDS under Group 7 with Thirty-one units to fifty units (31-50)
Fee for 30 units plus 25% of RPF for each additional unit
Fee for 30 units plus 30% of RPF for each additional unit
Fee for 30 units plus 20% of RPF for each additional unit
Fee for 30 units plus 15% of RPF for each additional unit
Recommended Professional Fee for Projects involving extensive detail such as designs for built-in components or elements, built-in equipment, special fittings, screens, counters, architectural interiors, and development planning and/or design.
15% of the PCC
12% of the PCC
10% of the PCC
7.5% of the PCC
Where the Architect is engaged to render opinion or give advice, clarifications or explanation on technical matters pertaining to his profession the chargeable RPF shall not
be less than;
P1,000.00 / hr
P5,000.00 / hr
P1,500.00 / hr
P3,000.00 / hr
Upon signing of the Service Agreement an amount equivalent to ____ of the agreed Professional Fee shall be paid by the Owner as engagement fee or as the acceptance fee of the Architect that shall cover the mobilization component of the services.
5%
10%
15%
20%
How many percentage of the Professional Fee allotted for the Periodic Construction Supervision (PCS)?
Five (5%)
Ten (10%)
Fifteen (15%)
Three (3%)
For this type of services, the term Architect refers to the Consulting Architect (CA) who may be the holder of a valid Specialist Certificate that may be issued by the Board and/or the Commission, upon due qualification or accreditation by the lAPoA.
SPECIALIZED ARCHITECTURAL SERVICES
FULL-TIME SUPERVISION SERVICES
POST-CONSTRUCTION SERVICES
COMPREHENSIVE ARCHITECTURAL SERVICES
Upon submission of the preliminary design, the Recommended Professional Fee under SPECIALIZED ARCHITECTURAL SERVICES (SPP Doc. 203) shall be;
30% of the fee
50% of the fee
20% of the fee
15% of the fee
The Recommended Professional Fee (RPF) per hectare for the first five (5 has.) hectares net to the architect.
P50,000.00
P150,000.00
P25,000.00
P100,000.00
The Recommended Professional Fee (RPF) for Fulltime Construction Supervision Services
1-1.5% of PCC
2-3% of PCC
1.5-2% of PCC
3-5% of PCC
The Owner will pay the Construction Manager a fixed
fee plus reimbursement of certain expenses incurred in the performance of basis services.
Cost Plus Fixed Fee
Cost plus Incentive Fee
Fixed Price Incentive
Firm Fixed Price
The services of the Architect as Construction Manager can be compensated by a Recommended Professional Fee (RPF) of?
1.5 - 3% of PCC
1.5 - 2.5% of PCC
2 - 3% of PCC
3 - 5% of PCC
The Recommended Professional Fee (RPF) based on value-pricing is from _____ of gross rental
4% to 6%
2% to 5%
5% to 10%
1% to 3%