Total questions: 17

Worksheet time: 9mins

Name
Class
Date
1.

The process mapping is a ______ diagram

a)

Data flow

b)

Work flow

c)

Circular

d)

Audit

2.

Control chart is a

a)

Process monitoring tool

b)

Process control tool

c)

Both (a) and (b)

d)

None of the above

3.

The objective of ISO-9000 family of Quality management is

a)

Customer satisfaction

b)

Employee satisfaction

c)

Skill enhancement

d)

Environmental issues

4.

Total Quality Management (TQM) focuses on

a)

Employee

b)

Customer

c)

None of the above

d)

Both (a) and (b)

5.

Which of the following is responsible for quality objective

a)

Top level management

b)

Middle level management

c)

Frontline management

d)

All of the above

6.

TQM & ISO both focuses on

a)

Employee

b)

Supplier

c)

Customer

d)

All of the above

7.

According to Deming, Quality problems are

a)

Due to method

b)

Due to management

c)

Due to machine

d)

Due to material

8.

Which of the following is for Environment management?

a)

ISO-14000

b)

ISO-9000

c)

ISO-26000

d)

ISO-31000

9.

Which of the following are not a basic concept of lean

a)

Kaizen

b)

Six sigma

c)

Value stream

d)

Non-value added

10.

Two of the seven categories of waste are:

a)

Inventory and cost

b)

Defects and reliability

c)

Waiting and motion

d)

Transportation and time

11.

Which of the following is not one of the 5S’s:

a)

Safety

b)

Sustain

c)

Shine

d)

Sort

12.

Dividing all items into three categories is an example of

a)

Shine

b)

Straighten

c)

None of the above

d)

Sort

13.

When R chart is out of control, we _____

a)

Take one more sample and recalculate the control limits

b)

Eliminate the out-of-control points and recalculate the control limits

c)

Eliminate the out-of-control points and the nearest two points, and recalculate the control limits

d)

Take no action

14.

Process control is carried out

a)

during production

b)

before production

c)

after production control

d)

All of the above

15.

The percent of the sample means will have values that are within ±3 standard deviations of the distribution mean is

a)

99.7

b)

97.6

c)

96.7

d)

95.5

16.

Using the terminology of statistical control, the variation within a stable system

a)

is random variation.

b)

results from common causes.

c)

is predictable within a range.

d)

all of the above.

e)

a and b.

17.

Using the terminology associated with statistical process control (SPC), the variation within a stable system is

a)

predictable within a range of values.

b)

controllable.

c)

in control.

d)

a and c.

e)

a and b.