SAFe For Teams Training - Course - Final Quizz

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

For who the PI system demo is intended to

(2 possible answers)

a)

The RTE

b)

The Business Owners

c)

The Agile Teams

d)

The Product Management

e)

The Scrum Masters

2.

What are the 3 levels of the Scaled Agile Framework?

a)

Epic, Feature, Story

b)

Essential, Large Solution, Portfolio

c)

Team, Program, Value stream,

d)

Integration, Deployment, Release

3.

What is the role of the Agile Release Train Engineer ?

a)

To ensure the technical integrity of all development in the Agile release train

b)

To coach teams to improve their results

c)

To serve as the Scrum master for the Agile Release Train

d)

To serve as the content authority at the program level

4.

Which factors helps unlock the intrinsic motivation of knowledge workers ?

a)

Team performance incentives

b)

Pay-for performance

c)

Parallel development

d)

Autonomy

5.

What is the major benefit of reducing batch size ?

a)

Increase visibility

b)

Increase predictability

c)

Increase Work-in-Process

d)

Decrease stress on the system

6.

What is the recommended size of an Agile Release Train ? (2 correct answers)

a)

From 5 to 12 agile teams

b)

From 3 to 10 Agile Teams

c)

From 20 to 80 people

d)

From 50 to 125 people

7.

Who or Which group is responsible to provide architectural guidance to the Agile Release Train ?

a)

Product Management

b)

System Team

c)

Enterprise Architect

d)

System Architect

8.

The RTE is a servant leader who displays which of 2 actions or behaviors (choose 2)

a)

Creates an environment influence

b)

Owns vision & roadmaps, program backlog & ROI

c)

Listens & supports teams in problem identification & decision making

d)

Identify market needs

9.

How does a team demonstrate progress?

a)

By showing the actual working product

b)

By presenting status slides

c)

By having the Product Owner verbally communicate to the stakeholders

d)

By showing screen-shots of the product

10.

When is the system demo conducted during program execution ?

a)

Each week

b)

At the end of every iteration

c)

When the System Team is ready

d)

Only when all the stakeholders are available

11.

What does a Program Board help teams to identify ?

a)

Velocity in achieving value

b)

Bottleneck to the flow of value

c)

Program predictability

d)

Dependencies between teams

12.

What visibility should Scrum masters provide during the Agile Release train sync ?

a)

Visibility into single source design decisions

b)

Visibility into progress & impediments

c)

Visibility into collaboration deployment

d)

Visibility into System Solution intent

13.

Which of the following is NOT part of the Innovation & Planning (IP) iteration ?

a)

PI Planning of next PI

b)

Inspect & Adapt workshop

c)

Innovation

d)

Teams retrospective

14.

Why is transparency so important to SAFE

a)

To enable continuous delivery of value

b)

Moderate improvements are achieved with ongoing transparency

c)

Transparency creates trust & trust is required for risk-taking

d)

To monitor access to the information

15.

Which Statement is true about Work-in-Process (WIP) limits ?

a)

Lower WIP limits results in fewer stories being completed

b)

Lower WIP limits improve flow

c)

Higher WIP limits provide richer feedback

d)

Higher WIP limits result in lower utilization