QUIZ 2-L4:C03 (SYSTEM INSTALLATION & COMMISSIONING)

Total questions: 12

Worksheet time: 6mins

Name
Class
Date
1.

All stated below are important aspects of equipment delivery EXCEPT...

a)

Full equipment information

b)

Packing safety.

c)

Follow-up on delivery

d)

Installation approval permit.

2.

Serial number and delivery date include in safety precaution for packing.

a)

True

b)

False

3.

Total protection, duration of cover,type and value.


What is the meaning of listed criteria in equipment delivery?

a)

Insurance

b)

Delivery documents

c)

Packing safety

d)

Full equipment information

4.

What is the method can be use for follow-up on shipping?

a)

sending fax

b)

on site installation

c)

access the route

d)

exchange and placement

5.

Compliance with packaging conditions, Precautions when removing the machine from the package, Complete the transportation to location, Equipment installation, Verification before on the electric power .


What is the meaning of items above?

a)

Full equipment information

b)

Insurance coverage

c)

Supervise the final installation

d)

Delivery documents

6.

Why the inspection of the packaging material must be carried out?

a)

To find position of utility

b)

To arrange the assembly team

c)

To use skilled workers to dismantle

d)

To find if damage of the packaging box.

7.

Use proper equipment to lift box, use the right rope like chain, box is placed on stable ground and use skilled workers to dismantle.


The statement above mention about precautions when remove machine from packaging.

a)

True

b)

False

8.

What is the important of packing list?

a)

Make sure the equipment is sealed in plastic or aluminum foil

b)

Silica gel is placed inside box if needed

c)

Can verify the contents and items listed in the box.

d)

Base box to be more firm and strong.

9.

Which is a NOT criteria need to be determine before the equipment is moved to the correct location?

a)

Correct placement or angle or position.

b)

Proper installation location / mounting tool.

c)

Quality of equipment.

d)

All pipes and channels are standard safety

10.

Why company needs outside contractor who can provide specialized services?

a)

If you do not have the skilled workers or correct equipment

b)

If pre-transportation planning is carried out pending delivery.

c)

To facilitate movement and also to avoid high costs.

d)

To move the equipment from the drop-off point to the actual location of the installation.

11.

What is the equipment information can be seen inside the tags?

a)

Serial number

b)

Delivery date

c)

Part of the packing list

d)

Size

12.

What is the meaning of the figure 1?

a)

Insurance coverage

b)

Machine classification

c)

Delivery date from the vendor

d)