1.

The reason for software bugs and failures is due to

a)

Software companies

b)

Software Developers

c)

Both Software companies and Developers

d)

Software

2.

Which one of the following models is not suitable for accommodating any change?

a)

Build & Fix Model

b)

Prototyping Model

c)

RAD Model

d)

Waterfall Model

3.

Identify the disadvantage of Spiral Model.

a)

Doesn’t work well for smaller projects

b)

High amount of risk analysis

c)

Strong approval and documentation control

d)

Additional Functionality can be added at a later date

4.

Software costs more to maintain than it does to develop

a)

True

b)

False

5.

The user system requirements are the parts of which document ?

a)

SDD

b)

SRS

c)

DDD

d)

SRD

6.

Which metric gives the idea about the contents on a web page ?

a)

Word Token

b)

Word Count

c)

Word Size

d)

Word Length

7.

COCOMO stands for

a)

Constructive cost model

b)

Comprehensive cost model

c)

Constructive cost estimation model

d)

Complete cost estimation model

8.

Project management involves the planning, monitoring, and control of the people, process, and events that occur as software evolves from a preliminary concept to an operational implementation.

a)

True

b)

False

9.

Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks?

a)

Software Macroscopic schedule

b)

Software Project scheduling

c)

Software Detailed schedule

d)

None of the mentioned

10.

Every task that is scheduled should be assigned to a specific team member is termed as

a)

Compartmentalization

b)

Defining milestones

c)

Defining responsibilities

d)

Defining outcomes

11.

Which of the following process is concerned with analyzing the costs and benefits of proposed changes?

a)

Change management

b)

Version management

c)

System building

d)

Release management

12.

The modification of the software to match changes in the ever changing environment, falls under which category of software maintenance?

a)

Corrective

b)

Adaptive

c)

Perfective

d)

Preventive

13.

Which granularity level of testing checks the behavior of module cooperation?

a)

Unit Testing

b)

Integration Testing

c)

Acceptance Testing

d)

Regression Testing

14.

A set of inputs, execution preconditions and expected outcomes is known as a

a)

Test plan

b)

Test case

c)

Test document

d)

Test Suite

15.

The testing in which code is checked

a)

Black box testing

b)

White box testing

c)

Red box testing

d)

Green box testing