Theory Quiz (DPN51203) - Chapter 8

Total questions: 20

Worksheet time: 59mins

Name
Class
Date
1.

Maintenance consist of the following action(s):

a)

Replace of component

b)

Repair of component

c)

Service of component

d)

All of the above

2.

The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as

a)

Down time

b)

Break Down time

c)

Both (A) and (B)

d)

Idle time

3.

The down time cost consists of

a)

Loss of production

b)

Wages paid to the workers

c)

Reduction in sales

d)

All of the above

4.

The following is not a classification of maintenance

a)

Corrective maintenance

b)

Timely maintenance

c)

Scheduled maintenance

d)

Preventive maintenance

5.

Belt of an electric motor is broken, it needs

a)

Corrective maintenance

b)

Scheduled maintenance

c)

Preventive maintenance

d)

Timely maintenance

6.

The following is (are) scheduled maintenance

a)

Overhauling of machine

b)

Cleaning of tank

c)

Whitewashing of building

d)

All of the above

7.

The ____ goes on increasing with the increase in degree of maintenance efforts.

a)

Cost of down time

b)

Cost of spares and maintenance

c)

Labour and Overhead Cost

d)

All of the above

8.

With the increase in preventive maintenance cost, breakdown maintenance cost

a)

Increases

b)

Decreases

c)

Remain same

d)

Any of the above

9.

A systematic approach for maintenance is

a)

Problem – Cause – Diagnosis – Rectification

b)

Problem– Diagnosis – Cause – Rectification

c)

Problem – Measure – Diagnosis – Rectification

d)

Problem– Diagnosis – Measure – Rectification

10.

(Down time in hours / Available hours) =

a)

Maintenance effectiveness

b)

Frequency of breakdown

c)

Effectiveness of maintenance planning

d)

None of the above

11.

(Number of breakdowns / Available machine hours) =

a)

Maintenance effectiveness

b)

Frequency of breakdown

c)

Effectiveness of maintenance planning

d)

None of the above

12.

Total productive maintenance aims at

a)

Less idle time

b)

Increase in productivity

c)

Zero down time

d)

None of the above

13.

State TWO (2) trouble spot for centrifugal pump that need to troubleshoot it.

a)

Bearings

b)

Shaft

c)

Wear rings

d)

Motor

14.

There are other failure for centrifugal pump that need to take it as maintenance job. EXCEPT.

a)

Packing leakage

b)

Loose impellers

c)

Shaft breakage

d)

Electrical power failure

15.

Plugging process line is one of the disturbance in process. There are potential materials that potentially as factor to plug a process line. EXCEPT.

a)

Slurries

b)

Molten polymers

c)

Dry solid

d)

Steam

16.

Identify TWO (2) basic techniques are used to deal with most unplugging and cleaning jobs involving process piping and equipment.

a)

Removing the plug by using pressure

b)

Cleaning with a solvent, acid, or caustic solution

c)

Physically remove it with insert a rod through pipeline

d)

Increase the process flowrate to push the plug materials

17.

What part of equipment is frequently used drilling (mechanical method) to unplug process line.

a)

Heat exchanger shell

b)

Heat exchanger tube

c)

Steam trap

d)

All of the above

18.

Basically heat can help to unplug process line. Justify that statement.

a)

It can melt the plug materials with increase the solubility.

b)

It can decrease the solubility of the plug materials

c)

Increase the viscosity of liquid materials

d)

None of above

19.

Identify TWO (2) functions of the solvent that had been used to unplug process line.

a)

It can make process line clear

b)

It can dissolves the plug material

c)

It acts as a flushing medium that removes plugs

d)

All of the above

20.

Do you think that maintenance and troubleshooting are two important aspects to make sure plant is in the normal operation.

a)

Yes

b)

No