WorksheetsBCA 1
Total questions: 10
Worksheet time: 2mins
Which of the following is not a fact-finding technique?
Third party enquiry
Interview
Questionnaire
Record reviews
Observation
Which of the following are SDLC models?
Waterfall Model
Pin Model
Spiral Model
Relational Model
Network Model
The first step in preliminary analysis is to (a)
Identify the model
V-Shaped Model
Waterfall Model
Spiral Model
Prototyping Model
A rectangle in a DFD represents _____________
A …………. System is no more than idea
(a)
System Development process is also called as__________
System Development Life Cycle
System Life Cycle
Both A and B
System Process Cycle
State True or False :-
Design specification report is the final output of System Analysis
True
False
The key considerations involved in the feasibility analysis is include
Economical
Technical
Behavioral
Personal
Identify the song from which movie is-
Race 3
Badhaai Ho
Kabir Singh
Simmba
